90-250 four rings manual cheap welding machine
Condition:New | Place of Origin:Zhejiang China (Mainland) | Brand Name:QINGLIANG | Model Number:90-250 four rings manual |
Input Voltage:220V | Current:15.9A | Power:3.6KW | Dimensions:830*560*600MM |
Usage:suitable for PE and PP pipes and fittings | Certification:ISO9001: 2008 | operating way:manually | product:cheap welding machine |
1. Product information
Model No. | QL90-250 four rings manual |
Materials | aluminum alloy casting, 45# steel |
Welding level(Φ, mm) | 90, 110, 125, 140, 160, 180, 200, 225, 250 |
Docking deviation | ≤0.3mm |
Working temperature | 220°c |
Total power consumption | 3.5KW |
Electric current | 15.9A |
Temperature deviation | ±3°c |
Environment temperature | -5……40°c |
Time required to reach soldering temoerature | <20min |
Materials can be welded | PE PP PB PVDF HDPE PVC |
Packing | plywood case |
MOQ | 1 PCS |
Delivery Port | FOB Ningbo/Shanghai, China |
Payment Term | full T/T with 30% deposit |
Lead Time | within 5 days after getting deposit |
Sample | available |
Certificate | ISO9001: 2008 |
Operating way | Manually |
2. Usage
Manually Operated cheap welding machine, suitable for PE and PP pipes and fittings. High quality design and construction provides an excellent machine for welding both on the worksite and in the factory. The use of high quality Aluminum casting allows for lower weight without compromising strenghth and performance.
3.Operating demonstration
a. The carriage Jawws are clamped around the pipe
b. The pipe ends are faced flat & parallel to each other to give a good mating for fusion.
c. The heater is placed into machine, Both pipe ends are brought together against the heater.
d. The pipe soaks against the heater and begins to melt. Both ends are brought together and beg in to bond immediately
e. The pipe is held at pressure until cool leaving a joint stronger than the pipe.
4. Certificates
5. Corporate Image
4. Package Picture
Packaging Detail:one plywood case: 830*560*600mmtotal gross weight: 111.00KG |
Delivery Detail:5 days after getting 30% deposit |