800T horizontal directional borehole drilling rig
1. to lay gas/oil transportation pipes, 2.can easily across wide rivers, big construction, 3.use 2 diesel engines - details see: https://www.machineto.com/800t-horizontal-directional-borehole-drilling-rig-10313490
Condition:New | Type:Rotary Drilling Rig | Power Type:Diesel | Place of Origin:Jiangsu China (Mainland) |
Brand Name:Gaotao Machinery | Model Number:GT8000-l | Usage:lay pipes | Voltage:24V |
Power(W):559KW | Dimension(L*W*H):20000*3200*3500 mm | Weight:45T | Certification:ISO; CE |
Warranty:1-2 years | After-sales Service Provided:Engineers available to service machinery overseas | walking:caterpillar with wiring control | cooling:hydraulic oil cooling |
8000T horizontal directional drilling rig
Main Technique Parameters:
Rig Weight(transportation status): 45T | Size of Rig(L×W×H): 20000×3200×3500 mm |
Max. Push & Pull Force: 8000KN | Size of Power station (L×W×H): 7500×2400×3000mm |
Max. Rotate Speed: 78r/min | Max. Torque: 217834N·m |
Drill Entry Angle: 6 -15° | Max. Push & Pull Speed: 23m/min |
Max. Diam. of Expanding Aperture: 2000mm(depending on the soil condition | Max. Construction Length: 3500m(depending on the soil condition) |
The Main parts:
1. the power station
- use caterpillar walking to make the transportation more easily
- use 2 setsCummins engine with559Kw/1800 r /min . When 2 engines both working the maximum torque and maximum push-pull force can be cheive. Which is very usefull for big peojects. while doing small projects, you can only use 1 engine to save half energy.
- choose Germany originally imported transfer case to ensure drilling head can get enough power from the engine
2. The main rig
- The caterpillar under the main rig can be removed when the rig is supported by the supporting legs on the project site .
- We are the only one manufacturer to use the 4 points clamping technology, whchi can clamp the drill rod more tightly
- low speed big torque Motor originally imported from France and the Italy original imported reducer can ensure the push-pull power
3. The operation Room
Packaging Detail:naking or as customer's requirment |
Delivery Detail:30 days after ordering |