80% oil output new design fully continuous machine engine oil distillation
Condition:New | Type:waste oil to diesel and gasoline,semi-continuous | Place of Origin:Henan China (Mainland) | Brand Name:TL |
Model Number:TL-5Z/10Z | Voltage:220V/380V | Power(W):18kw-22kw | Dimension(L*W*H):D1400*L2000*16MM |
Weight:32T-36T | Certification:CE &ISO, BV | Warranty:1 year free | After-sales Service Provided:Engineers available to service machinery overseas |
steel:stainless steel at the reactor bottom | pressure:decompression &Normal pressure | temperature:380degree Max | noise:<85dB |
oil yield rate:75% | pollution:environmantal | fuel:coal ,firewood,gas | end product:diesel oil ,gasoline, kerosene |
Brief introduction for oil dsitillaiton machine
1. Raw material and its oil yield
a)Waste engine oil:
diesel yield : 75%-80%
gasoline: 10%-15%
b) black oil andcrude oil
2. Layout with machine in use
3. Equipment List
No. | Name of part |
1 | reactor (Q245R boiler plate) |
2 | Cover |
3 | Main machine base |
4 | Distillation tower |
5 | Fractionating tower |
6 | Condenser tube |
7 | Extracting tank |
8 | Oil water separator |
9 | Oil washing tower |
10 | Filtering tower |
11 | Preheater (seamless ) |
12 | Elevated tank |
13 | Hot blast stove |
14 | Water sealing tank |
15 | Dust remove system |
16 | Water pump |
17 | Oil pump |
18 | Induced draft fan |
19 | Electric control cabinet |
20 | Cooling tower |
21 | Waste gas treatment system |
4.The main technical characteristics:
a) The key of this achievement is catalytic cracking technical under negative pressure and chemical extraction process.
b) The complete environmental equipments. For example, the waste gas burning machine and removal dust and sulphur system.
c) Using the simple chemical method to remove the product color and odor.
d) Not less 85-90% of pure crude oil output.
e) Reasonable equipment, advanced production technical, high degree of automation, completely security equipped.
f) Multi-function machine.Continuous feeding and continuous production.
g) The final oil nears to 0# diesel standards ,you can directly used in the motor cars.
5.Note
1.Container: 40HQ & 40FR
2.Payment terms: 30%T/T deposit after singing the contract, 70%T/T or LC at sight is accepted
3. Installation Salary: The buyer need to prepare flight tickets, visa for the installation engineer. Thn arrange the food and accommodation, translator.
We give 1 month free installation, beyond one month, The buyer should pay 60$/day to the installation engineer
4.Delivery time: 15-20days after getting 30%T/T deposit
5. Warranty: 1 year free warranty.
6. Gurantee: The foundation drawing will be sent to the buyer after the deposit
The documents will be couriered to the buyer after delivery, except LC terms
We welcome your inquiry all times!!
Packaging Detail:40HC and 40FRsmall accrssories will be packed in the wooden boxes |
Delivery Detail:20-25days after the deposit |