8 million plaster board production line

plaster board production line, 1. lower power ansumption ,high degree of automation, 2. use natural gas,oil,diesel line coal - details see: https://www.machineto.com/8-million-plaster-board-production-line-10087992
Place of Origin:Hebei China (Mainland)Brand Name:tianshiModel Number:wx-10one:for paper system
two:powder supply systemthree:water supply systemfour:foam systemfive:forming system
six:conveying systemseven:transit systemeight:drying systemnine:heating system
name::plaster board production line   
8 million plaster board production line
contact supplier for 8 million plaster board production line


8 million plaster board production line

Equipment production: 200 ,0000 square meters - 2000 ,0000 square meters/year

Drying type: thermal oily/hot air type products raw materials: gesso protective paper water starch foaming agent

Raw material consumption to 3000mm 1200mm * watch: (for example) 8mm plasterboard *

Raw material name each dosage plaster board production line

21 grams per square metre paper 1.587 KG

Gesso 19.5 KG

Water 14KG

Modified starch 0.15 KG

Foaming agent 0.13 KG

White latex 0.07 KG

Electricity 0.5 KW

Coal 2.75 KG (6,000 calories)

Equipment schemes:

plaster board production line

Production process is introduced:plaster board production line

Preparation:

Modified starch, retarder, pulp, quantitative measurement of water into stir hydrapulper pulp, and then pumped into raw materials into the pulp reserve tank spare;

Foaming agent and water in proportion to input mix preparation cans, vesicant, pumping foaming agent reserves pot spare;

Gesso raw material conveying equipment by the ascension into the bunker spare;

Ingredients:

After all the accessories through measurement to pump into the blender, mix a qualified gypsum slurry.

Molding conveying:plaster board production line

After, paper machine, blender uncoilling into the pulp fell to shake the paper into under platform machine, in molding machine specification extruded on the plasterboard, then finish early belt in solidification in roller conveyer solidifying, finished on fixed length and final set, after cutting machine, cut into the length of the transit need transverse system, steering after the two horizontal machine, while leaving gypsum then by distribution machine distribution into drying chamber drying

The board

plaster board production line Dryer after the finish drying task of a fixed length trigger complete plasterboard, no, packaging, storage after completion of forklift stacking delivery to use complete inspection packaging, packaging area complete production process.

8 million plaster board production line
Packaging Detail:CONTAINER of 40 feets
Delivery Detail:60 DAYS