7-Roller calendar/calender/calendaring/calendering machine
Place of Origin:Jiangsu China (Mainland) | Brand Name:Broadenwin | Model Number:7-Roller Calender |
The product is used for the calendering the pure cotton fabrics, chemical fiber, bast fiber, wool spinning and blended fabrics; it is also used for the roll compacting of building materials, plastic packing materials and paper. If furnished with schreinering and embossing roller, it can also be used for the after-finish of schreinering and embossing.
Factory Overlook
Certificates
Workshop
Enterprise Management
Service Process
A. To introduce the characteristics of products, slove the questions raised by customers in brief and record the special requirements of customers.
B. To supply several solution to customers for reference according to the requirements of customers and offer prices depending on different solution.
C. To decde the final scheme and sign the contract.
D. According to the final Scheme, organize the operation and offer customers the installation drawing. Send the engineer to prospect on spot, if necessary.
E. After the equipment arrives on site, our engineer shall provide a free instruction in erection on site, debugging after installation and technical training.
F. After we received the telephone from customers, we will try our best to instruct customers to solve the problem; if customers really cannot knock over the engineers shall arrive on site a minute earlier as soon as possible and prevent from fear of disturbance in the rear:
In China a. Within 500 kilometers, the engineer arrives within 24 hours at the latest;
b. Within 1000 kilometers, the engineer arrives within 48 hours at the latest;
c. Beyond 1000 kilometers, the engineer arrives within 72 hours at the latest;
G. Within the year when the equipment is brought into operation, our after-sales engineers shall repay visits customers at irregular intervals and give suitable suggestions to customers for reference, according to the actual use. Meanwhile, we will ask customers for suggestions for improvement, so that we will make long-term progress in technology.
Packaging Detail:wooden case |
Delivery Detail:70 days after the commencement of the order |