6t Tower crane
Condition:New | Application:Construction | Rated Loading Capacity:1.5t | Rated Lifting Moment:1000kNM |
Max. Lifting Load:8t | Max. Lifting Height:180m | Span:55m | Place of Origin:Henan China (Mainland) |
Brand Name:Mega | Model Number:TC5515(QTZ100A) | tower crane:tower crane | Feature:Jib Crane,Tower Crane |
6t Tower Crane,building tower crane,construction tower crane
Features:
This series of tower cranes has a horizontal jib frame, a jib-trolley radius-changing mechanism and a hydraulic self-raising mechanism. It is original in design, reliable in operation and satisfactory in shape. Equipped with all necessary safety devices, these cranes show a good speed-control capacity, satisfactory operating stability and high work efficiency.
Components :
1. Hoisting System
2. Climbing System
3. Trolley System
4. Slewing System
5. Electrical System
6. Crane Jib
7. Counter Jib
8. Mast Sections
9. Tower Head
10. Control Cabin
Specification:
Model | TC6516Q(TZ160) | TC5518(QTZ125) | TC5515(QTZ100A) |
Amplitude (M) | 65 | 55 | 55 |
Independent Height (M) | 50 | 46/52 | 50/50 |
Max. Height (M) | 190 | 200 | 180 |
Max. Lifting Capacity (T) | 10 | 8 | 8 |
Assistant Support Frame | 6 | 6 | 4 |
Main Material | 135×135×12 (square steel tube) | 135×135×12 (square steel tube) | 135×135×12 (square steel tube) |
Standard Mast Section Dimension | 1.935×1.935×2.8 | 1.835×1.835×2.5 | 1.835×1.835×2.5 |
Lifting Speed (a=2)(m/min) | 100/50 | 100/50 | 100/50 |
Slewing Speed (r/min) | 0.61 | 0.6 | 0.55 |
Trolley Travel Speed (m/min) | 60/30/10 | 60/30/10 | 60/30/10 |
Max. Lifting Moment (KNm) | 1600 | 1250 | 1000 |
Working Temperature (C) | 20~+40 | 20~+40 | 20~+40 |
Undercarriage Form | Four Landing Legs Without Ballast | Type A. Cross-shaped beam with slanting strut and ballast Type B. Cross-shaped beam with slanting strut but no ballast | Type A. Cross-shaped beam with slanting strut and ballast Type B. Cross-shaped beam with slanting strut but no ballast |
Packaging Detail:standard packing |
Delivery Detail:30 days-90 days after receiving advance payment |