6000pcs/h egg cake tray machine/chian auto energy-saving hydraulic hot press machine/ISO9001 CE wastepaper pulp moulding machine
Condition:New | Product Type:Egg Tray Machine | Processing Type:Pulp Molding Machine | Place of Origin:Hunan China (Mainland) |
Brand Name:SH | Model Number:SH-6000A | Voltage:380V | Power(W):358.5KW |
Certification:CE | Warranty:ONE YEAR FOR FREE | After-sales Service Provided:Engineers available to service machinery overseas | Production speed:6000-6500pieces/hour |
Floor space:55*18*4.5M | Pulp concentration for molding machine:0.8-1% | Pressure of compressed air:0.5-0.7Mpa | Vacuum negative pressure:minus0.045---minus0.055Mpa |
Frequency:50Hz |
SH- 6000A egg tray production line scheme
1.Pulping system
name | hydraulic pulper | high-frequency vibration sieve frame | pulp pump | strengthening of self-priming pump | agitator | control cabinet for pulping system |
specification | 3.0 M3 | 1.8M2standard component(made in china) | standard component(made in china) | standard component(made in china) | standard component(made in china) | C2 |
quantity/unit | 1unit | 1unit | 3units | 2units | 3units | 1unit |
motor | 45KW | 4.0KW | 7.5+2*4KW | 2*5.5KW | 3*4.0KW |
2.Forming system
name | rotary formig machine | molds | roots vacuum pump | screw air compressor | vacuum buffer tank | air compressor storage tank | white water pump | high-pressure water pump | refiner machine | power cabinet for forming system |
specification | 1.8pcs of forming platens and 1pc of transfering platen 2.platen size: 1450*470mm 3.forming efficiency:13-15cycles/min | 1.64pcs of plastic forming mould size: 295*295mm 2.8pcs of transferring mould materials: colophony | 2units | 1.5 M3 2units | 1.0 M3standard component(made in china) | standard component(made in china) | standard component(made in china) | standard component(made in china) | C1 | |
motor | 2*3KW | 2*55KW | 37KW | 5.5KW | 5.5KW | 15KW |
3.Drying system
name | conveyor | blower | induced fan | burner | bellows | tracked board | fore dynamics | postern dynamics | chain | heating box |
quantity/unit | 44M*2units | 20 | 2 | 18 | 96 | 1520 | 2 | 2 | 380M | 240 |
motor | 20*4KW | 2*3KW | 2*3KW |
4.Control cabinet for drying system specification:C3 and packing machine
Peripheral Equipment by user
1. Slurry pond and pool are constructed with Reinforced concrete structure, inner wall sticked with white ceramic tile.
2. The Pipe,Valves, Electric Line, Electric Cable, Line Channel, Mounting (Support), Fastening etc for the Pulp-Moulding Production System.
3. The Power and Water Supply.
Remark
1.consumption( /HOUR): water:900-950kg waste paper :440-460kg electricity:290-305kw 0# diesel oil:90-110kg natural gas:110-150kg LPG:90-110kg |
2.The above quotation doesn’t include the packing cost of large equipment. |
3.The way of payment:30% of the total amount of money signed in the contact must be paid as the contact |
becomes effective, 65% of the total amount of money must be completed before delivery of equipment. |
The rest 5% must be paid within 7 days after finishing all the installation. |
4. Delivery time: 90 working days after received deposit |
5.The design of technological process and plant arrangement will be provided according to the plant situation of the customer. |
6. workforce: 10-12people / working group |
7.we are in charge of installing,degugging and training, the total time is about 2 months |
8.buyer side should be responsible for two way flight tickets, local hotel and food charge, as well as $80 per day |
for each technican as salary/subsidy |
9.Container:6 40' HQ |
10.guarantee: repair and maintenance one year for free. |
Welcome to contact us for further information!
looking forward to hear from you!
Packaging Detail:wrapped with corrugated sheets, then fixed by steel wires in the container. |
Delivery Detail:90 working days after received deposit |