530x20mm tri-joint pipe cold forming press machine
Place of Origin:Hebei China (Mainland) | Brand Name:Fengliyuan | Model Number:YST-530-20mm | Condition:New |
After-sales Service Provided:Overseas third-party support available | power mode:hydraulic | mother material:steel pipe | power consumption:low |
usage:make tri-connection |
This kind machine can make carbon and alloy steel tee of pipe with molds, different size molds for different size of tee.
Model | YST- 530 -20mm. | Date | Term of validity | 90 days | Lead time | 60 Days | ||||
Size L*W*H m | Weight | 235 T | Working scope | Can make carbon steel tee within diameter530-20mm (equal diameter) | ||||||
Price (EXW) | 480000 USD | Guarantee term | 12 months | |||||||
2950000 RMB | ||||||||||
The Main Technical Parameters of The Machine 1. Cylinders : a.the upside cylinder(*1): inner diameter 1200mm with a trip 1000mm, nominal pressure:28Mpa b.the side-cylinder (*2):inner diameter 1200mm with a trip 450mm ,nominal pressure:28Mpa c.the ejection cylinder(*1):inner diameter 250mm with a trip 400mm , nominal pressure:28Mpa the thrust of the upside cylinder:3200tons the thrust of the side-cylinder:3200tons the thrust of the upside cylinder:150tons The Max speed of the up cylingder is 40cm/min. The speed of the side cylinders is 0-18cm/min (at the same time) 2 pump station:160Scy-plunger pump :3 set3 55KW Motor: 3sets electric valves manipulations, water flooding pump:1 set main engine frame: welded of 100,120 mm medium plate. | ||||||||||
The scope of supply 1. The frame for the main engine: 1 parts(cylinder:4 pieces with 2 blocks of T shaped slide block) 2. The hydraulic pump station: 1 set(160Scy-plunger pump :3 sets. 3. 55KW Motor: 3sets,water flooding pump: 1set , 4. manual valve , High-pressure oil watch:1 piece, 5. oil out-letting valve 1 piece.) | ||||||||||
The purchaser should prepare a. mould(tee tire of other mode) b. hydraulic oil c. connecction wire | ||||||||||
After-sales service When the machine arrive your factory, the water, electric prepared well, then we would send our technician to direct to install until the machine works.(accommodation supplied by the buyer and the buyer should offer the installing tools.) We are responsible for the repair in one year after the machine out of our factory, | ||||||||||
Payment terms | 30% advance payment by T/T before the production, 65% by T/T before goods delivery. 5% by T/T after installation and commissioning. |
The tees made by the tri-connection machine:
Other products of our company:
Packaging Detail:wooden plate or nothing |
Delivery Detail:depend on the specifications and the customer's need |