500l Beer brewing equipment/machine
Processing:Fermenting Equipment,100% TIG welded and sanitary | Condition:New | Place of Origin:Shandong China (Mainland) | Brand Name:DEGONGET |
Model Number:DEGONGET-500L | Processing Types:Alcohol | Voltage:220V or 380V adjustable | Certification:ISO9001:CE,ISO2000 |
Warranty:24months | After-sales Service Provided:Engineers available to service machinery overseas | Heating method1.:Electric heating (with electric tube in the mash tank) | Heating method2.:Direct fire (eg natural gas) |
Control:Manual;Semi-automatic;Full-automatic(PLC) | Cleaning:CIP, automatic | Type:Stainless steel & red copper | Other capacity:50l,100l,200l,300l,400l,500l,600l,1000l,1500l,2000l,3000l |
Service:Installing and debugging | Trade detail::FOB, CIF... | Payment terms::T/T, L/C... |
Beer brewing equipment 500l
Jinan Degong Equipment Technology Co., LTDis a professional beer brewing equipment manufacturer. Our products include home and luxury beer pub equipment, and large brewery equipment. The daily output is from 50L to 5000L.
This mini beer brewing equipment is suitable for bars, hotels, restaurants, or maybe the big familie. With it, you can brew fresh beer at scene with unique flavor, and self-brewry beer contains much more Nutrients than the bottled beer. If this kind of beer brewing equipment is placed in your hotel or restaurant, it will surly be a great focus and the new darling for the beer-lover, and attract more customers who would like to pay much for your delicious beer.
A DETAIL
Mash system | |
01.Mash & Lauter Tank | Inner(SUS304),thickness:3.0mm; External-Jacket (Stainless steel), thickness: 1.5mm; Cylinder (sharp type, SUS), thickness: 1.5mm. Inner surface treatment: welds grinded to Ra 0.6µm. Insulation: Polyurethane-thickness 80 mm. |
02.Boiling &Whirlpool Tank | |
03.Hot water tank | |
04.Mill machine | 200Kg/h;Power: 3kw, voltage:380V |
05.Boiler water treatment | 1000kg/h;heating;water pump power: 1.5kw |
06.steam generator | 50kg/h;Steam temperature: 151-170°C |
07.Wort pump | 3000L/h;Power:0.75KW, lift15m, Rev:2880r/min |
08.Plate Heat exchanger | 10Square meters;exchange board material SS304 |
09.Pipeline & Valve VLV | SUS304 ;single surface weld & double surface forming, no dead angle |
10.Wort measuring meter | Stainless steel |
11.Venturi tubes | Stainless steel;Heating exchanger wort export |
12.Venturi tubes | Stainless steel;Heating exchanger wort export |
13.Saccharometer | Glass |
14.Rake | SUS304 Lees out rake |
15.Operation platform | Stainless steel |
Fermentation system | |
01.Fermentation tank | Inner(SUS304),2.5mm;Jacket-1.5mm;welds grinded to Ra 0.4µm (attached all-sided cleaning ball);Polyurethane-thickness 80 mm;cone 75°resist compression design,SUS miller board temperature drop. |
02.Yeast adding tank | Stainless steel 304 |
03.Food tube | Include tube Joints and hose hoops |
04.Refrigerant pipelines | PPR/ Stainless steel |
05.Keep warm tube | polyethylene |
06.Electromagnetic put air out | 1 piece |
07.Electronic gauges | 6 sets |
Cooling system | |
01.Ice water tank | Material: Inner(SUS304),thickness:2.5mm;External-Jacket (Stainless steel); Insulation: Polyurethane-thickness 80 mm. |
02.Refrigerating unit | Capacity: 9000 kilocalorie; medium:Freon 22 |
03.Circulate pump | carbon steel |
04.Pipeline& Valves | PPR/ Stainless steel |
Control system | |
01.Mashing control | Three methods: Manual control Semi-automatic control Full-automatic control (PLC) |
02.Fermenting control | |
03.Cooling control | |
04.Cleaning control | |
Cleaning system | |
01.Washing pump(moving) | Stainless steel;3000l/h |
02.Alkali tank | Stainless steel;100L |
03.Sterilization tank | Stainless steel;100L |
B. SERVICE
1. Installation and brewing training
2. Two-year warranty
C. PICTURES
All above are Mashing tanks
All above are Fermentation tanks
This is The Ice Water Tank
This is the Control Cabinet
Our CE Certification
Fresh beer for drinkers
Welcome to inquiry
Packaging Detail:inner :PE paperouter : iron framepackaging needs to be convenient for transportation with Truck |
Delivery Detail:30 days after receiving 30% T/T deposit |