500L beer brewery equipment,brewery equipment

material:red copper or stainless steel 304usage:beer brewingISO9001:2008 & CE certificateturnkey project beer brewing - details see: https://www.machineto.com/500l-beer-brewery-equipment-brewery-equipment-10023986
Processing:Fermenting Equipment,argon arc weldingCondition:NewPlace of Origin:Shandong China (Mainland)Brand Name:liangyou
Model Number:LY-0.5Processing Types:AlcoholVoltage:380V,220VCertification:ISO & CE,PED,ROHS certificate
Warranty:36 monthsAfter-sales Service Provided:Engineers available to service machinery overseasmaterial::1) red copper 2) stainless steel 304usage::beer brewing
500L beer brewery equipment,brewery equipment
contact supplier for 500L beer brewery equipment,brewery equipment


Beer brewing equipment

1) S.S.304&Red Copper Cap
2) Mirror Polishing
3) Walkable price
4) 3Years after-sales services

material:red copper with nice-looking

subject:turnkey project and on-site install free

500L beer brewing equipment

1.skilled processed tanks
2.CE,ISO9000
3.free installation,personnel training
4.personalized customization
5.many flavors


500L Micro brewing equipment

Item500L Beer equipment standard configuration system
SpecificationDaily output 500 litres beer per day, 12-15 days fermentation period
Date of production and deliveryProduction period is 30 days,and delivery date is about 35days
PackagingInside stretch film and PE paper
SizeOne 40 feet container
Power consumption per day80 Kw / h
Total water content2.5t per day
Raw material consumptionMalt: 100 KG, Hops: 0.3KG, Yeast: 0.5KG.
Terms of paymentAdvance payment30%,deposit is in, contract comes into effect, Settle full payment when the delivery
Warranty periodMain machine guarantee for three years, all life service.
Price adjustableCan be negotiation
Saccharification appearanceclassic style Stainless steel shape design
Floor area50square meters approx
Cooling SystemThe heat exchanger & refrigeration unit
Mode of transportationocean shipping or by train
Delivery pointsQingdao port
The third party testThrough the BV the authentication of the company
After-sales service modeProviding beer production technology, brewing formula and person training service. Free installation debugging. Free installation training technical service 25 days, the buyer reasonable for the board and lodging and ticket cost.

Packaging & Delivery

Packing details:Packing with steel stainless steel and wood cases.

Delivery details:Delivery time within 40 days from Qingdao.

Trade terms:

Payment: By T/T or L/C

30% deposit and 70% balance before shipmen

Delivery time: 10-50 working days, subject to the capacity of the equipment

The terms of the delivery: FOB, CFR, CIF

MOQ: 1 Set or parts of beer equipment

Service:

1. Providing beer production technology, brewing formula.

2. Providing cost analysis, brew house design, equipment production

3. Free installation debugging and person training service.

4. Main machine guarantee for 36 months, all life service.

Our products have passed CE and ISO certificate:

Pictures for your reference as below:

500L beer brewery equipment,brewery equipment
Packaging Detail:by container loading or according to your requirements
Delivery Detail:less than one month

Related Product for 500L beer brewery equipment,brewery equipment