300tpd China Gold Mining Equipment- Gold CIL Plant

Gold Mining Equipment- Gold CIL Plant, 1.good experience, 2.low investment leaching plant, 3.high recovery rate, 4.ISO 9001& CE - details see: https://www.machineto.com/300tpd-china-gold-mining-equipment-gold-cil-plant-10318587
Place of Origin:Shandong China (Mainland)Brand Name:XinhaiModel Number:300tpdCondition:New
After-sales Service Provided:Engineers available to service machinery overseascapacity:300tpdplant power:1000kwproject schedule:8months
scope of supply:design, equipment, installation and commissioning, personnel trainingother services:supply one year spare partsshippment:10-15pcs of 40ft containergold recovery rate:95-98%
gold ore type:oxide oreequipment include:crushing, grinding, classification, cyanide leaching .  
300tpd China Gold Mining Equipment- Gold CIL Plant
contact supplier for 300tpd China Gold Mining Equipment- Gold CIL Plant


300tpd China Gold Mining Equipment- Gold CIL Plant

Yantai Xinhai offers turnkey solutions for 300tpd Gold Mining Equipment- Gold CIL Plant. We are one of the leading project suppliers for300tpd Gold Mining Equipment- Gold CIL Plantand we work closely with our customers to fulfill their specific needs for a customized packaged solution. Specialized in the fabrication of these machines for18 years and this enables us to be in a leading position in the field of300tpd Gold Mining Equipment- Gold CIL Plant.


We have been in 300tpd Gold Mining Equipment- Gold CIL Plantfor more than18 years. We have established a great deal of experience in recent years developingSmall Gold Mining Equipment .Our 300tpd Gold Mining Equipment- Gold CIL Plantline mainly include following equipment:

Feeder

Jaw crusher, cone crusher

Vibrating screen

Belt conveyors

Ball mill

Spiral classifer

Hydrocyclone

Thickener

Leaching Tanks

Electrowinning and desorption device

Gold smelting furnace


Our 300tpd Gold Mining Equipment- Gold CIL Plantare extensively used in metallurgy, mine, chemistry, coal, building material and grinding material industries.


Yantai Xinhai services:
Ore laboratory test Ore beneficiation test Flowchart designing and layout designing.Full set of machines Erecting and commissioning Training Technical consolation

300tpd Gold Mining Equipment- Gold CIL Plantturnkey project contents:

1. Project engineering design

The project engineering design includes the whole beneficiation flowsheet from the beginning of raw ore plie in the plant to the tailing transportation, general layout drawing, transportation in the plant, electricity power, automation, water supply and drainage, civil construction, foundation, technical economy and so on. The design drawings and documents will be sent to the buyers after the design was finished. This design only includes the gravity separation plant inside. The roads out of plant, the pipeline from the water source area to the plant, outside power system to transformer in the plant are not included.

2.Equipment manufacture and supply

We can supply the whole line of gold leaching plant, including:

a. crushing system

b. grinding and classification system

c. leaching system

d. desorption and electrowinning device

e. gold smelting system

Seller confirms the requested mechanical equipments in the whole plant during the project engineering design. After offer the detailed equipments list to the buyer for the confirmation, the seller produces the main equipments and purchases the auxiliary equipments.

3. Package and delivery

Seller makes a classification package plan for all the kinds of equipments and materials. Transport the goods Sudan port.

4. Installation

(1)Manufacturing and installation of process metal structures of the plant:

Including steel hopper, steel chute, steel platforms for operation and steel support; excluding civil engineering, steel structure platform and steel structure work of the workshop.

(2)Manufacturing and installation of process pipelines of the plant:

Mainly including pipelines of slurry, water, gas and reagent, valves, elbows, flanges and fasteners; water pipelines excluding parts from water source to the plant, tailings pipelines excluding parts from exit of tailings pipe to tailings dam.

(3)Manufacturing and Installation of distribution boards and operation control cabinets, laying of electric wire and cable, lighting fixtures.

If distance between switch house and plant is more than 3m, will be charged in addition. Excluding switch house, including but not limited to transformer, inlet wire, high-low voltage distribution boards in switch house.

The installation work done by seller includes: installation for all kinds of main and accessory equipments of plant, plant electric fitting after transformer or generator, power distribution equipments and lighting system, electric wire and cable, all pipelines of water supply and drainage and ore slurry, nonstandard device manufacturing on site, service platform, handrail and ladders (exclude steel construction).

The seller provide installation instrument, offer the above kinds of installation requested materials, labors, welding rods and paints during installation. All kinds of pipelines, valves, steel materials, electricity wires, electric cables, lamps and electrical power box, switch, the power distribution cabinets are included in the installation materials.

The buyer should supply electric, crane, oxygen and ethyne during installation.

The transformer, water supply pipelines from water source place to beneficiation plant and tailings pipelines from beneficiation plant to tailing pond are out of the duty of the installation.

The installation staff according to the project schedule arrive at the site in batches.

5. Commissioning

The seller will be in charge of guiding the whole beneficiation plant line machinery without loading and the load test running for achieving the perfect status to meet the design targets and output.

The buyer will undertake the water, electric, steel balls, ore, lubrication oil and grease, cleaning instruments and so on needed during commissioning.

6. Personnel training

Seller trains the buyer’s managers, technicians and operators to operate the equipments and automation system and control the processing independently, and to manage the plant, maintain the equipments and accept the training of safety knowledge; confirm the contents of the item descriptions one by one in accordance with the contract requirements of the project, transfer all the technical documents and deliver the plant to the buyer.

7. other notes

The foundation, workshop, civil construction and tailing pond will be done by the local company entrusted by the buyer according to the drawing& design provided by the seller.

300tpd Gold Mining Equipment- Gold CIL PlantON SITE

PRINCIPLE FLOWSHEET of 300tpd Gold Mining Equipment- Gold CIL Plant

EQUIPMENT LIST OF 300tpd Gold Mining Equipment- Gold CIL Plant

Please kindly tell me your mine processing capacity (tons per day) and your ore properties, we will design the most efficient plant for you.

300tpd China Gold Mining Equipment- Gold CIL Plant
Packaging Detail:The main machinery is in nude packing,and spare parts in Wooden or steel box standard export packing, suitable for long distance delivery.
Delivery Detail:50days

Related Product for 300tpd China Gold Mining Equipment- Gold CIL Plant