300Meter Depth Core Drilling Rig

300meter Depth Core Drilling Rig, 1.Easy to operate and High efficiency, 2.Six wheels mounted,Convenient for Transportation - details see: https://www.machineto.com/300meter-depth-core-drilling-rig-10313402
Condition:NewType:Core Drilling RigPower Type:DieselPlace of Origin:Henan China (Mainland)
Brand Name:SiweiModel Number:SW-BZ-YX300TUsage:OtherPower(W):50HP
Certification:ISO9001:2008Warranty:12 monthsAfter-sales Service Provided:Engineers available to service machinery overseasDrilling Depth:300m
Open Hole Caliber:400mmEnd Hole Caliber:75mmDrilling Angle:90°-65°Spindle Lifting Capacity:4500kg
Spindle Forward Speed:57 - 1024 r/minHoist Single Line Lifting Capacity:4000kgMud Pump Displacement:250 L/minDiesel Engine Power:24HP
Product Name:300 Meter Depth Core Drilling Rig   
300Meter Depth Core Drilling Rig
contact supplier for 300Meter Depth Core Drilling Rig


300 Meter Depth Core Drilling Rigmainly adapted to suit for core drilling with diamond or tungsten-carbide tipped bit. It can also be used for engineering exploration, water well and foundation hole drilling

Technical parameter

Drilling depth

m

300

Open hole caliber

mm

400

End hole caliber

mm

75

Drilling rod

mm

Φ60

Drilling angle

90°-65°

Spindle

Spindle forward speed

r/min

57-1024

Spindle reverse speed

r/min

45-212

Spindle stroke

mm

560

Spindle inner diameter

mm

96

Spindle lifting capacity

KG

4500

Hoist

Single line lifting speed

m/s

0.515 0.894 1.421 1.948

Hug floodgate belt width

mm

90

Tightrope caliber

mm

14

Hoist single line lifting capacity

KG

4000

Reel caliber

mm

305

Reel cubic measure

m

65

Mud pump

Horizontal BW-250 mud pump

Displacement

L/min

250

Work pressure

kg/cm2

80kg/cm2

Water inlet caliber

mm

75

Water to exit caliber

mm

50

Power(Diesel engine )

HP

24

Oil pump

Duplex gear oil pump F532/F314

Front displacement,pressure

50L/min 20Mpa

Behind displacement,pressure

16L/min 20Mpa

Drilling rig Power

Diesel engine

Hp

490 50HP

Certificate

300Meter Depth Core Drilling Rig
Packaging Detail:The exporting standards packing,or the customers' requirements.
Delivery Detail:Around 25days after the deposit.

Related Product for 300Meter Depth Core Drilling Rig