300L/day pub beer brewing equipment / beer making equipment
Processing:Fermenting Equipment,Beer Brewing | Condition:New | Place of Origin:Shandong China (Mainland) | Brand Name:Tiantai or OEM |
Model Number:TJ-200, TJ-300, TJ-500, TJ-600, TJ-1000 | Processing Types:Alcohol | Voltage:3phase/380v/50Hz or customized | Power(W):15-70Kw depends on capacity |
Dimension(L*W*H):20-100M2 depends on capacity | Weight:Various in different models | Certification:CE ISO | Warranty:36 months from commissioning |
After-sales Service Provided:Engineers available to service machinery overseas | Equipment Material:SUS304 or Red Copper M2 for outer shell | Thickness of Tanks:3mm for inner container/2mm for outer shell | Color Available:Mirror SUS, Luxury red copper |
Heating:Electric/steam | Heat Insulation:Polyurethane or Rockwool with Thickness=80mm | Inner Polishing Precision:0.4 Micrometer | Volume Design:Properly according to the capacity request |
Controlling System:PLC; HMI or Touch Panel | Plants Type:Turnkey or Customerized | Accessories:Available |
300L/day pub beer brewing equipment
MicroHotel / Resturant /Barbecue /Ginshop / Groggery Beer Brewing Machine, Beer Brewery System, Beer Brewing equipment, beer brewing plant, micro beer machine, beer equipement
1. Introduction of Hotel / Barbecue / Resturant / Ginshop Beer Brewing Equipment
Hotel beer brewing equipment is a good choice for ginshop, barbecue, restaurant who brew beer for customer at scene. Small floor coverage makes it possible to show consumers the whole process of beer brewing. The luxury and sanitary process comforts the consumers and give them impressed experience.
2. Beer Equipments List of Various Models
Each winemaker has his own understand when brewing beer. We are able to design the equipments according to your personalized request. If you don’t have experience in this field, you can choose our standard solution as below:
Model Items | TJ-200 | TJ-300 | TJ-500 | TJ-600 | TJ-1000 |
Capacity | 200L/Day | 300L/Day | 500L/Day | 600L/Day | 1000L/Day |
Area Request | 20M2 | 40M2 | 50M2 | 60M2 | 100M2 |
Installed Power | 15Kw | 22Kw | 35Kw | 45Kw | 70Kw |
Steam Request | 0.1Ton/Hr | 0.12Ton/Hr | 0.15Ton/Hr | ||
Water Consumption | 0.8M3/Day | 1M3/Day | 1.5M3/Day | 2M3/Day | 3M3/Day |
3. Equipments Components of Beer Brewing Plant
Equipments Request | Components |
1. Milling System | Malt Miller |
2. Mashing System | Mash/Lauter Tun |
Boiler Tank | |
Boiler | |
Heat Exchanger | |
Wort Pump | |
Stiring Device (Optional) | |
Other accessories are available: 1. Ornamental Pipe; 2. Mashing Pipeline; 3. Operating Plateform; 4. Yeast Feeder; 5. Venturi Tube; 6. Butterfly Valve DN40; 7. Butterfly Valve DN32; 8. Soft Pipe; 9. Dregs Rake; 10. Sugar Measuring Cylinder; 11. Saccharimeter; | |
3. Fermenting System | Fermentation Tank |
Other accessories are available: 1. L-Pipe; 2. Butterfly Valve; 3. Pressure Gage; 4. Solenoid Valve; 5. Vacuum Valve; 6. Cooling Pipe; 7. Thermal Insulation Pipe; | |
4. Cooling System | Ice Water Tank |
Refrigeration Machine | |
Centrifugal Pump | |
Evaporator | |
Ice Water Pump | |
Relative Pipes and Valves | |
5. CIP System | Washing Tank |
Sterilization Tank | |
Pump and Valve | |
6. Filter System | Kieselguhr Filter |
Membrane Filter | |
Filtered Beer Tanks | |
7. Packing System | Fresh Keg Packing Machine |
Pop Can Packing Machine | |
Glass Bottle Packing Machine | |
8. Controlling System | Mashing Control Panel |
Fermenting Control Panel | |
Refrigerating Control Panel |
4. General Flow Chart of Beer Brewing
5. Our company
Our company is a professional beer equipment manufacturer. We are specialized in professional design, manufacture, installation and commissioning of various beer equipments and supporting facilities. Our products include mashing equipment, fermentation equipment, yeast spread cultivation equipment, and refrigeration equipment for small and medium-sized brewery, hotel, pub and etc.
Packaging Detail:Wooden/Veneer case for LCL; Plastic film wrapped and iron frame fixing for FCL |
Delivery Detail:15-40 days for small and middle capacity/2-4 months for big capa |