300L bee brewing equipment.beer making equipmet,beer brewery,micro beer equipment
Processing:Fermenting Equipment | Condition:New | Place of Origin:Shandong China (Mainland) | Brand Name:KL |
Model Number:KL-0.3 | Processing Types:Alcohol | Certification:ISO&CE | Warranty:12 MONTHS |
After-sales Service Provided:Engineers available to service machinery overseas | material:stainless steel or red copper |
Jinan Keli Machine Equipment Production Co., Ltd is a very professional beer equipment manufacturer and supplierwithmore than 20 years’ experiencein this field, and our products sell well both at home and abroad.
Our manager is a senior technician with two patents in refrigerating equipments dedicated for beer equipment.
And we are the main supplier of beer refrigerating equipments for most beer equipment factories in Jinan.
300L Beer Brewing SytemTechnical Parameters | |||
Brewhouse | 300L | Refrigerator | dedicated for beer equipment, we have two patents for this |
Fermenting tank | 600L | Temperature measurement | Bi-metal thermometer |
Ice water tank | glycol | Insulation material | polyurethane |
Material | SS304 or red copper | Malt miller | 100kg/h |
Color | Metal Color | MOQ | 1 set |
Thickness | 2-3mm | Payment terms | T/T |
Controlling way | automatically or PLC | Package | Steel frame and wooden case |
Bottom | cone | Delivery date | 40 days |
Heated way | Electricity or LPG | Service | Free installation, one year warranty |
Hotel beer equipment is a good choice for ginshop, barbecue, restaurant, pubs, who brew beer for the customers at scene. The luxury shape, small space demanded, no only has the ornamental value, but also can show the whole process of the brewering to the customers, let them learn the deep cultural connotation of beer.
We guarantee the highest quality and best price . And welocme to inquire and visit to our factory.
For further information, please don't hesitate to contact us!
Packaging Detail:exporting standard, wrapped with black cotton or with plastic film firstly then outside by iron frame or wooden box. or according to customers' requirements. |
Delivery Detail:within 40 days after 50% T/T |