3-10 LPM industrial oxygen machine for ozone sterilizer
Condition:New | Place of Origin:Guangdong China (Mainland) | Brand Name:oZocenter | Model Number:CH-OL |
Usage:Fruit & Vegetable | Type:sterilization machine | Voltage:220,220V or 110V | Warranty:1 year |
commodity name:oxygen machine for ozone sterilizer | oxygen capacity:3, 5, 7.5, 10 LPM | outlet pressure:0.06-0.08 Mpa | application:oxygen machine, ozone sterilizer |
concentration:90+-3% | material:zeolite or aluminum | technology:PSA |
3-10 LPM industrial oxygen machine for ozone sterilizer
With the technology of pressure swing adsorption (PSA), CH-OL series oxygen generator uses special molecular sieves to absorb the oxygen from the air and remove impurities output and drain water automatically.
Oxygen purity is up to 90+-3%, and oxygen outlet pressure is 0.06-0.08 Mpa.
Features of oxygen machine spare parts:
1, Generate oxygen from oil free air compressor.
2, Two material of molecular sieve: zeolite or high-effective aluminum.
3, Easy to install and maintain.
4, Oxygen capacity is 3-10 LPM with oxygen purity of 90+-3% and oxygen outlet pressure of 0.06-0.08 Mpa.
Description:
1. Simple structure, easy operation, and stable oxygen output.
2. Material: zeolite/aluminum; each unit can work independently, and oxygen output can reach to 3-10 LPM or higher.
3. With chiller to cool air, no need additional refrigerant dryer and reduce cost.
4. Oxygen purity can up to 90+5%; Two oxygen cylinders exchange working, auto drain water, nitrogen and other impurities output.
5. Parts with shipping: chiller, fan, and air inlet pipe.
6. Oxygen outlet pressure: 0.06-0.08 Mpa.
Application:
Use for industry oxygen generators in lines like:
Welding / Brazing Furnace Enrichment
Fermentation Glass Industry
Fish Farming Ozone Generator
Sewage Treatment Pulp & Paper
Chemical Oxidation Rough Cutting
Battery Manufacture Melting
Mini-Steel Mills Cement & Lime Kilns
Metal Spraying Copper Smelting
Specifications:
Two towers Oxygen concentrator units:
Packaging Detail:carton case |
Delivery Detail:for 1-10 units, 3-5 working days after receiving the payment |