2T construction hoist
Condition:New | Place of Origin:Shandong China (Mainland) | Brand Name:Betop | Model Number:SC100/100 |
Rated Loading Capacity(kg):1T/cage | Hoisting Speed:33m/min | Max Lifting Height:250m/min | Dimension(L*W*H):3.0*1.3*2.2 |
Loder Weight:2T | After-sales Service Provided:Engineers available to service machinery overseas | Color:Red/blue/silver/orange/your requirement | Sling Type:Rack and gear |
Main electrical system:Schneider | Model of motor:YZZ132M-4 | Type:Construction electric winch/passenger hoist/gjj construction hoist | Usage:construction hoist |
Service:Installation Service | Surface treatment:Blasting, Baking finished, galvanized | Voltage/Frequency:380v/50hz Can be arranged to your requirement | Driven style:dual-drive / three-driven |
2T construction hoist
Protective Measures of construction hoist:
1. A Master switch On the operation board: When the button closed, unexpected action to other buttons can not let cabin working.
2. Anti-falling safety device(with Centrifugal breaking system ): When all other protection device losing action, it can brake the cabin from falling.
3. Mechanical inter-locking door: when the cabin running it can close by itself from protecting people from dropping.
4. Overload calling device
5. upper and lower travel limit:They can limit the cabin go over the top mast.
6.The top mast section have no rack in order to limit the cabin overrunning and dropping .
7. Manual button: You can operate the botton to let the cabin go down wheninterruption of power supply .
8. Emergency switch: When the cabin losing control and over-runing, you can operate the button.
The main technical parameters :
1.Construction hoist of common models:
Characteristic | Model | Rated Loading | Lifting Speed | Motor Power |
Double cabin | SC200/200 | 2×2000kg | 33m/min | 2×(3×11kw) |
SC150/150 | 2×1500kg | 33m/min | 2×(2×15kw) | |
SC100/100 | 2×1000kg | 33m/min | 2×(2×11kw) | |
Single cabin | SC200 | 2000kg | 33m/min | 3×11kw |
SC150 | 1500kg | 33m/min | 2×15kw | |
SC100 | 1000kg | 33m/min | 2×11kw |
2. Construction hoist with Interver:
Characteristics | Model | Rated Loading | Lifting Speed | Motor Power | |
Double Cabin | Low-speed | SC200/200D | 2×2000kg | 0-33m/min | 2×(3×11kw) |
SC100/100D | 2×1000kg | 0-33m/min | 2×(2×11kw) | ||
Mid-speed | SC200/200Z | 2×2000kg | 0-55m/min | 2×(2×11kw) | |
SC100/100Z | 2×1000kg | 0-55m/min | 2×(2×11kw) | ||
Single Cabin | Low-speed | SC200D | 2000kg | 0-33m/min | 3×11kw |
SC100D | 1000kg | 0-33m/min | 2×11kw | ||
Mid-speed | SC200Z | 2000kg | 0-55m/min | 2×11kw | |
SC100Z | 1000kg | 0-55m/min | 2×11kw |
Product details:
1. Production process: Strict material selection— blanking— inspection — welding— inspection— Blasting — inspection —Baking finished or galvanized— inspection — Finished Product
2. The product can be customized according to customers'requirements(drawing, specifications and so on).
A:The Mast section(color is variable) is made of seamless pipe.(The high quality seamless steel pipe is good verticality, anti-pressure, anti-aging, thickness and so on)
B:Main structure of cage is made of high-quality steel after bending.(The bended steel is firm, good verticality, stability. Moreover it ensure stable of the whole structure)
C:The cage is boarded up by all punched aluminum sheet.( It is anti-aging , ante-rust, light-weight and beautiful in its service life)
D:Access door interlock device protects the saftey of people and materials
E:Equiping with fall arrestor
F:Equiping with interver in variable frequency construction hoist
Workshop Details and Transport Details:
1.All Production Line adopt standard of the fixture, mould, gauge
2.Workshop 5S mangement style
3.Diffrent driven system
4.Each Construction Elevator should be testing-run and adjustment in Factory
5.Construction Site
6.Exhibition in Qingdao(China)
7.Transport to Qingdao(China) port
8.International certification
Packaging Detail:Construction hoist seaworthy container shipment in nude(40HQ) |
Delivery Detail:7-15 days after payments |