2M2125A tube honing manufacturer CNC tube honing machine
Condition:New | Place of Origin:Jiangsu China (Mainland) | Brand Name:HITECH | Model Number:2M2125A |
CNC or Not:CNC | Warranty:one year | After-sales Service Provided:Engineers available to service machinery overseas | color:optional |
honing diameter:40-250mm | max honing diameter:7000mm |
2M2125A tube honing manufacturer CNC tube honing machine
1.Main parameter
Technical Parameter | 2M2125A |
Honing diameter | φ40-250 |
Max. honing depth | 7000 |
Center height | 350 |
Clamp diameter of workpiece | φ60-350 |
Spindle speed of the honing bar | 25-250rpm |
To and fro speed of the honing bar | 3-20m/min |
Motor power of the honing bar | 7.5kw |
Flow of the hydraulic pump for the honing head expanding system | 12.5L/min |
Max. pressure of the oil pump for the honing head expanding system | 4Mpa |
Flow of the coolant pump | 50L/min |
Capacity of cooling box | 950L |
Motor power of honing head expanding system | 1.1kw |
Motor power of cooling pump | 2.2kw |
Power of reciprocating motor | 5.5kw |
2.Brief introduction
This machine is a special equipment used for honing cylindrical deephole parts such as various hydraulic oil cylinders and cylinders. Hole diameter accuracy of machined workpieces can be up to or over IT7 and surface roughness Ra0.2-0.4μm. It can also repair and maintain taper and
elasticity of machined workpieces with the help of partial honing.
This machine is mated with KND CNC System. AC servo motor, honing box adopt stepless speed, Autocycle timing control unit is used on this machine during reciprocating honing so as to assure accuracyof machined holes and decrease the intensity of labor.
This machine is controlled by electrical operating center. It is easy, safe and reliable in operation.
It can perform not only honing of mass products but also small batch workpieces. Itis perfect equipment for machining deep-hole parts.
If you have any question or need any help, please don't hesitate to contact us.
Packaging Detail:seaworthy packing |
Delivery Detail:70-90 days after received the advance payment |