25-75 m3/h concrete station
Condition:New | Power Type:Electric | Place of Origin:Shandong China (Mainland) | Brand Name:shandong lianchuang |
Model Number:hzs75 | Power(W):85 | Weight:35000 | After-sales Service Provided:Overseas service center available |
Max.productivity:75m³/h | Mixer:js1500 | Stroage bucket capacity:3x8m³ | Discharge height:1.7-3.8m |
charge height:2.9m | Total power:110kw | Total weight:35000kg | Working Cycle Period:75s |
Charging Capacity:2400L | External dimension (L*W*H):According to the model of disposition and layout |
HLS Series
Ready-Mixed Concrete Batching Plant
1.What are the merits of your product?
Excellent performance
High reliability
Accurate weighing
Excellent maintenance
2. What products can do ?
It can use many manners ofcombining and chargingaccording to customers’ needs. It can producedry-rigid,half dry-rigid ,plastic ,and every distribution ratio concreteand use the mixing technology of wrapping-stone mode which can improve the quality of concrete greatly.
3.Do you have other model?
Now we haveHZS25,HZS40,HZS5000,HZS75,HLS60,HLS90,HLS120,HLS180andany othertypes available.
Model | HZS25 | HZS40 | HZS50 | HZS75 |
Max theory productivity(m3/h) | 25 | 35 | 50 | 75 |
Mixer | JS500 | JS750 | JS1000 | JS1500 |
Storage bucket capacity(m3) | 3×3 | 3×4 | 3×7 | 3×8(12) |
Maximum size of aggregate(mm) | 60/80 | 60/80 | 60/80 | 60/80 |
Discharge height(m) | 1.6-3.8 | 1.6-3.8 | 1.6-3.8 | 1.6-3.8 |
Charge height(m) | 2.7 | 2.7 | 2.9 | 2.9 |
Aggregate measuring accuracy(%) | ±2 | ±2 | ±2 | ±2 |
Cement measuring accuracy(%) | ±1 | ±1 | ±1 | ±1 |
Fly ash measuring accuracy(%) | ±1 | ±1 | ±1 | ±1 |
water measuring accuracy(%) | ±1 | ±1 | ±1 | ±1 |
additive measuring accuracy(%) | ±1 | ±1 | ±1 | ±1 |
Power(kw) | 35 | 50 | 60 | 85 |
Total weight(kg) | 14000 | 18000 | 25000 | 35000 |
4.Can we trust your product quality ??
Yes,you can!!
our company isISO9001 quality certificationthrough the earlier of one of construction machinery, And the adoptionofenvironmental certificationin 2007.
5.After-sales and Packaging team.
1.Spare parts will be delivered as you need.
2.Engineers will go to clients’ site for guiding the installation and test-running;
3.Warranty period: 12 months since the installation and commisioning;
4.Service team will follow every placed order regularly till warranty period finished
6.Detailed picture
Concrete mixer
The screw conveyor
Computer control system
Batching machine
Sheet cement silo
7.Customer visiting
Packaging Detail:Standard Exporting package |
Delivery Detail:15-20 days after advanced payment |