2013 top tech waste tyre refining oil machine of 15 ton
Condition:New | Type:pyrolysis machine | Place of Origin:Henan China (Mainland) | Brand Name:HaoTian |
Model Number:HT-2 | Certification:ISO&CE | Warranty:lifetime | After-sales Service Provided:Engineers available to service machinery overseas |
capacity:15ton | structure:horizantal rotation | rotary mode:internal gears | rotary speed:0.4turn/m |
heating mode:direct heating | cooling mode:water cooling |
Turn rubbish into treasure
Rubbish (such as wate tire, waste plastic, waste rubber, waste oil etc.) are increasing every day.
At the same time, oil resources are decreasing every day.
We use green technology (pyrolysis and distillation) recycling waste to oil resourses.
The flow chart
The 3D Drawing
Service after purchasing
1. Delivery time- It will be 20 working days after we receive the deposit.
2. Installation and Training-Our company will send one technician for each set of machine for guiding your installation, testing the machine and training your workers. The installation period shall be one month; otherwise, you have to pay extra salary for the technician with the price of RMB400.00 per day (equals USD61.00 per day). And the round tickets and accommodation shall be taken by customer
The function of the final products
Fuel oil: Widely used as fuel oil in industries such as steel and iron factories, ceramics or chemical industries or hotels, restaurants etc. or used for generators to get electricity.
Carbon black: used for construction bricks with clay
also can be used as fuel
and can be deep process
Steel wires: Sold or reprocessing
Combustible gas: Can be recycled and used during process as fuel.
the quick detais of pyrolysis machines
No. | Item | parameter |
1. | The raw material | Waste plastic; black oil waste tire and rubber |
2. | Total capacity | 15 T/Batch |
3. | The dimension of reactor | 2800*8800 |
4. | Average oil productivity | 30%-85% (depend om raw material ) |
5. | Average waste gas productivity | 5% |
6. | Working time | 20 hs |
7. | Pressure of machine | Negative pressure |
The certificates
Packaging Detail:containers |
Delivery Detail:20 days after down payment |