2013 New Supply classical concrete mixer machine JS2000
Condition:New | Place of Origin:Henan China (Mainland) | Brand Name:ODF | Model Number:ODFL-399 |
Weight:12500kg | Dimension(L*W*H):concrete mixer | Power(W):55kw | Certification:CE |
Warranty:one year | After-sales Service Provided:Engineers available to service machinery overseas | Color:Optional | Accuracy of water supply:Errorâ¤2% |
Rated Productivity:â¥100m3/h | Max Size of Aggregate:80mm | Power of water pump:4KW | Material:Carbon steel |
2013 New Supply classical concrete mixer machine JS2000
Special reel make the wire rope have a longer life.
High quality ware-resistant alloy casting parts and advanced production technology ensure lining plate and mixing blade uniform clearance.
High efficiency and low energy Consumption
2012 New Supply classical concrete mixer machine JS2000
Discharge door is designed as arc shape,simple in sealing structure but significant in performance and.
Planetry gear box
Two heavy-duty gesr box are specially customized for the mixer. All of the shock brought
quick loading or restarting can be easily and safely buffered and absorbed.
Shaft seal
The shaft seal adopts reliable axial seal and all sealing parts are easy to be removed and replaced, suitable for bad work conditions.
Technical parameters
Model | JS2000 | |
Output capacity(L) | 2000 | |
Input capacity(L) | 3000 | |
Theoretical productivity(m3/h) | ≥100 | |
Size of aggregates(scree/rubble) | 80 | |
Working cycling time(s) | 60 | |
Overall weight(kg) | 11000 | |
Outside size | Conveying state | 5680×2250×2735mm |
Working state | 10720×3870×10726mm | |
Mixing blade | Rotating speed | 23 r/min |
Qty | 2*8 | |
Mixing motor | Type | Y180L-4 |
Power | 75kw | |
Hoist motor | Type | YEZ160L-4 |
Power | kw | |
Pump motor | Type | 80JDB-45 |
Power | 4kw |
2013 New Supply classical concrete mixer machine JS2000If one of our products are interested you ,please let me know ,I will give you my best supply for your reference
Packaging Detail:Standard packaging, as requested |
Delivery Detail:7-10 days after the deposit payment |