2013 New High Speed Brooms Brush Making Machines In China /CNC 5 Axes Brooms Brush Drilling and Tufting Machines
Condition:New | Application:for making brush | Automatic Grade:Automatic | Production Capacity:900 holes/minute |
Place of Origin:China (Mainland) | Brand Name:YX | Model Number:510 | Voltage:3/380V,50HZ |
Power(W):4000W | Dimension(L*W*H):2.32x1.92x2.22m | Weight:2300kgs | Warranty:1 year |
After-sales Service Provided:Engineers available to service machinery overseas | technology:German technology |
2013 New High Speed Brooms Brush Making Machines In China /CNC 5 Axes Brooms Brush Drilling and Tufting Machines
Technical characteristics:
Bored withthree drilling head and two tufting head, high-speed processing,high-volume,cost-effective
This machine can produce many different kinds of brushes or brooms which have different filling angles, by changing specific platform
Bored with three high speed drilling head: hole diameter from3.0mm up to6.0mm,and tufting tools from min.3.0mm up to6.0mm
Hair by: round nails or flat nails.
Three kinds of the optional platform type:
1,platform for radial, parallel and radial/parallel tufted brushes.
2,platform for bowl brushes and semi-spherical brushes(such as toilet brushes and “Swedish style” dish-washing brushes)
3,platform or rollers and hair brushes
PLC and touch panel control system of man-machine, Chinese and English display, simple to understand.
Allow to save as 1000 procedure and easy for the creation of new models
Wearing parts and spare parts are standardized designs to reduce hair mechanic technology dependence.
our machine can produce either one color or two color brush, and also drill or tuft separately.
Technical parameters:
Maximum production speed: up to900holes/minute
The maximum filament length:240mm
Dia.Of tufting holes:3.0mm-6.0mm
Machine size:2.32m*1.92m*2.22m(length * width * height)
Power consumption:4000W
Driving motor: AC Servo motor
Power Supply: three-phase380V
Packaging Detail:wooden boxsize of machine: 2.32x1.92x2.22m |
Delivery Detail:About 50-60 days after received 30% of the deposit. |