2013 hot sale stainless steel industrial potato peeling and cutting machine
Condition:New | Place of Origin:Shandong China (Mainland) | Brand Name:YS | Model Number:YSQS400-10 |
Type:potato peeling and cutting machine,spiral peeling and cutting | Voltage:220v | Power(W):0.75kw | Weight:100kg |
Dimension(L*W*H):880*510*980mm | Certification:ISO9001;BV;Alibaba Assessed Supplier | Warranty:1 year | After-sales Service Provided:Engineers available to service machinery overseas |
Item:potato peeling and cutting machine | material:stainless steel | application:peel and cut potatoes | features:integral multifunctional |
usage:supermarket,hotel,cantten,schcool | function:thickness adjustable | guarantee:1 year | color:gray |
name:peeling and cutting potatoes |
2013 hot sale stainless steel industrial potato peeling and cutting machine
Features of potato peeling and cutting machine:
1. peel,slice,shred,piece,strip integral machine
2. made from high qualitystainless steel
3. made from special steel, sharp and durable blade
4. It imatates man-made vegetable cutting action with high efficience.
5. makepieces,shredders,flakes,chips.
6. integral potato machine
7. reasonable design,high performance,easy operation,easy clean.
8. keep the vegetables smooth,unharmful,unpolluted and good appearance.
9. adjustable thickness
10. most advanced potato processing machine
Technical Parameters of potato peeling and cutting machine:
Model | Power | Output Capacity | Weight | Dimensions |
YSQS400-10 | 0.75kw/220v | 80kg/h | 100kg | 880*510*980mm |
YSQS400-30 | 1.1kw/380v | 150kg/h | 130kg | 1130*660*1130mm |
Pictures of potato peeling and cutting machine :
We use the best material to produce high quality machine
We ensure every step of production with the strict test
We keep the spare parts in the specialized storage tidy
Packaging and Shipping of potato peeling and cutting machine:
Package:Wooden case
Package Size:930*560*1030mm
Quantity in 20G'P Container:45 sets
Terms of payment: 50% prepayment by T/T,50% balance against B/L copy
Payment methods: T/T,L/C,West union,Paypal, Escrow
Terms of delivery: 15 days after receipt of 50% prepayment by T/T less than 10 sets
Best package,Best service,Fast speed,Safe delivery
Shipping Expense per Container:
Line | Port | 20 'GP (USD) | 40 'GP (USD) |
Europe | Hamburg/Rotterdam/Felixstowe | 825 | 1625 |
Antwerp/Southampton/Bremerhaven | 825 | 1625 | |
Novorossiysk | 1400 | 2450 | |
Middle East | Haifa | 1025 | 2050 |
Istanbul/Mersin | 900 | 1800 | |
Dubai | 900 | 1800 | |
Abbas | 1050 | 2100 | |
Riyadh | 1400 | 2600 | |
Southeast Asia | Nhava Sheva | 525 | 770 |
Karachi | 700 | 1275 | |
Singapore | 200 | 380 | |
Manila | 350 | 650 | |
Sydney/Melbourne/Brisbane | 950 | 2200 | |
Africa | Casablanca | 1400 | 2650 |
Aqaba | 1050 | 1780 | |
Durban/Cape Town | 700 | 1550 | |
Dar-es-Salaam | 1250 | 2400 | |
North America | Auckland | 1050 | 2100 |
Los Angeles/Long Beach | 1600 | 2000 | |
Jacksonville/Charleston | 2470 | 3070 | |
South America | Santos/Buenos Aires/Montevideo | 1450 | 2900 |
Callao/San Antonio/Meijilones | 1100 | 2200 | |
San Jose/Corinto | 1291 | 2600 |
The shipping expense is for your reference.
It may change according to the actual market situation.
How To Order:
Please consult us for more information of our products by email or online chatting tools such as Skype and TradeManager. We will provide you most suitable suggestions and solutions to make sure that you get the best machines. When we have a deal we will sign the contract. We will make production after receiving the prepayment. We will deliver the machines as soon as possible after finishing production and test.
Certificates and our Credit:
How to use:
1.Please read the introductions and specifications of the machine before operation
2.Please don’t leave the machine in its working time, and keep children away from the machine
3.It’s forbidden to clean the main engine of the machine with water before or after operating, and avoid the water on the machine thus to prevent leakage of the electricity; IF you will clean the machine, please switch off the power firstly and clear it with dry cloth except for the main engine
4.If you won’t use it for a long time, please put the machine in dry and ventilate place in case it is affected with damp and mouldy.
Contact Information:
Packaging Detail:Wooden case |
Delivery Detail:15 days after receipt of 50% payment by T/T less than 10 sets |