2013 High-Technology Multi-functional Corn Flour machine
Condition:New | Place of Origin:Henan China (Mainland) | Brand Name:win tone | Model Number:dnm-3b |
Production Capacity:300-1000kg/h | Voltage:380v | Power(W):7.5kw | Weight:300kg,3000kg |
Dimension(L*W*H):2200x500x120 | Certification:ISO9001:2008 | TYPE:grain processing equipment | feature:high-technology |
service:free for all life | function:hulling milling | processing:corn wheat bean,buckwheat | spare part:one year for free |
spindle speed(r/min):860 |

DNM-3B Corn Flour Mill
This machine is employed for the hulling, gritting and milling of corn. After the hulling treatment of the product, the net kernels were sent to the gritting and milling chamber. Then through the process of crushing and grinding, high quality grits and flour were produced.
The machine fits in the small type food processing points in towns, especially for countryside user, which is their first choice.
National Patent No.:multi-functional High-efficient flour machine ZL 2010 2 0689469.8
TYPE | CAPACITY | POWER (KW) | RATED VOLTAGE (V) | SPINDLE SPEED(R/MIN) | WEIGHT (KG) | SIZE (MM) | |||
DNM-3B | Corn Hulling | Corn Grits | Corn Flour | Wheat Hulling | 7.5 | 380 | 860 | 300 | 2200*500*120 |
300 | 1000 | 350 | 400 |
Win Tone Manufacturer Honor
Welcome select our grain processing machine, and visit our factory.Our professinal engineers and technicians will serve you with all technical support.
Thanks for your browse

Packaging Detail:We will pack by the protect film inner, water-repellent plastic outside. The wood packing is necessary if send by less than a container. The machine will fixed by steel rope in the container. Make sure it is in good condition when arrived destination. |
Delivery Detail:7 days after receiving your L/C or deposit |