2013 full 304 stainless steel RXH-54-C 400kg/batch fruit and vegetable processing machines mushroom drying machine
Condition:New | Type:Tray Dryer | Place of Origin:Henan China (Mainland) | Brand Name:AZEUS |
Model Number:AZS-DM730 | Voltage:customizable | Power(W):0.45-1.8kw | Dimension(L*W*H):4460mm*2200mm*2290mm |
Weight:2800kg | Certification:CE | Warranty:12 months | After-sales Service Provided:Engineers available to service machinery overseas |
name:mushroom drying machine | function:mushroom drying machine | material:304 stainless steel | capacity:50-400kg |
power:0.45-1.8kw | steam consumption:10-72kg/h | electricity consumption:9-60kw/h | thermal area:10-100m2 |
air volume:3400-13800m3/h | temperature used:±2°C |
2013 Full 304 Stainless Steel RXH-54-C 400kg/batch Fruit and Vegetale Processing Machines Mushroom Drying Machine
Brief Introduction of Mushroom Drying Machine
1. This Vegetable/Fruit/Food dryer is widely used for dehydration of vegetable, pharmaceutical, chemical, food, agricultural and sideline products, aquatic products, light industry, heavy industry materials and products. Such as vegetables, fruits, fishes, medicines, Chinese herbs, particles, granules, packing bottle, pigment dyes, sausages, plastic resins, and baking finish etc.
2. Both inside and Outside are stainless steel.
3. Stainless steel drying plate with plate size is 640x460x45mm
4. The material of heat preservation: fiberglass cotton w/thickness 80mm
5. Stainless steel drying car
6. Energy saving style air blast machine: 3 pcs with power 0.45kw
7. Heat source: steam OR electricity
8. Temperature is from 50°C to 150°C for steam heating and 50-350°C for electricity heating.
9. digital display: 1 set
Main Technical Parameter ofMushroom Drying Machine
Raw Material Available ofMushroom Drying Machine
Detailed Pictures ofMushroom Drying Machine
Package ofMushroom Drying Machine
400kg/batch Dryer Package ofMushroom Drying Machine
Controller ofMushroom Drying Machine
Packaging Detail:standard wooden package or as your requirement |
Delivery Detail:within 15 days after receiving deposits |