15 million plaster board production line
Place of Origin:Hebei China (Mainland) | Brand Name:tianshi | Model Number:wx-50 | one:for paper system |
two:powder supply system | three:water supply system | four:foam system | five:forming system |
six:conveying system | seven:transit system | eight:drying system | nine:heating system |
name::plaster board production line |
15 million plaster board production line
Equipment production: 200 ,0000 square meters - 2000 ,0000 square meters/year
Drying type: thermal oily/hot air type products raw materials: gesso protective paper water starch foaming agent
Raw material consumption to 3000mm 1200mm * watch: (for example) 8mm plasterboard *
Raw material name each dosage
21 grams per square metre paper 1.587 KG
Gesso 19.5 KG
Water 14KG
Modified starch 0.15 KG plaster board production line
Foaming agent 0.13 KG
White latex 0.07 KG
Electricity 0.5 KW
plaster board production line
Coal 2.75 KG (6,000 calories)
Equipment schemes:
plaster board production line
Production process is introduced:
Preparation:
Moplaster board production line
dified starch, retarder, pulp, quantitative measurement of water into stir hydrapulper pulp, and then pumped into raw materials into the pulp reserve tank spare;
plaster board production line Foaming agent and water in proportion to input mix preparation cans, vesicant, pumping foaming agent reserves pot spare;
Gesso raw material conveying equipment by the ascension into the bunker spare;
Ingredients:
After all the accessories through measurement to pump into the blender, mix a qualified gypsum slurry.
plaster board production line
Molding conveying:
After, paper machine, blender uncoilling into the pulp fell to shake the paper into under platform machine, in molding machine specification extruded on the plasterboard, then finish early belt in solidification in roller conveyer solidifying, finished on fixed length and final set, after cutting machine, cut into the length of the transit need transverse system, steering after the two horizontal machine, while leaving gypsum then by distribution machine distribution into drying chamber drying
plaster board production line
The board
Dryer after the finish drying task of a fixed length trigger complete plasterboard, no, packaging, storage after completion of forklift stacking delivery to use complete inspection packaging, packaging area complete production process.
Packaging Detail:CONTAINER of 40 feets |
Delivery Detail:60 DAYS |