120T Hydraulic Static Pile Driver
Condition:New | Place of Origin:Hunan China (Mainland) | Brand Name:CHTC JOVE | Model Number:JVY120A |
Max.piling pressure:120tf | Color:Red/Blue/Green/Yellow |
CHTC JOVE Hydraulic Static Pile Driver:
Main Technical Parameters
Max. Piling pressure(tf) | 120 | Rise stroke (mm) | 700 | ||||
Piling speed (m/min) | Max | 4.26 | Min. Side Pile Distance (mm) | 400 | |||
Min | 1.5 | Min. Corner Pile Distance (mm) | 570 | ||||
Piling stroke (m) | 1.5 | Max. hoisting weight (t) | 8 | ||||
Move stroke(m) | Longitudinal Pace | 1.6 | Max. hoisting pile length (m) | 12 | |||
Horizontal Pace | 0.4 | Power(kw) | Main engine | 22 | |||
Square pile (mm) | Min | 200 | Crane engine | 22 | |||
Max | 350 | Overall dimensions(mm) | Work length | 9000 | |||
Round pile (mm) | Min | 200 | Work width | 4600 | |||
Max | 350 | Transportation height | 3000 | ||||
Slewing angle (°) | 12 | Total weight (t) | 122 |
Structure& Function
Hydraulic Static Pile Driver consists of clamping and piling mechanism, lifting mechanism, hoisting mechanism, hydraulic system, electric system, etc, with the functions of hoisting, pressing, walking and steering.
Operational Characteristics
1. Civilized construction; Clean; No noise; No vibrations; No construction wastes.
2. Reliable Construction Quality; Piling process is similar to static load testing, where pile bearing force can be displayed. 100% pile success rate is guaranteed.
3. Fast piling and High efficiency; One Hydraulic Static Pile Driver (shortened as HSPD )can drive piles in total of 600~800m per 8 hours, much faster than other modes. Especially suitable for large-scale or time-constraint projects.
4. Walking and steering freely. Easy to align piles.
5. Compact conformation. Easy to disassemble & assemble.
Technology features
Except for the general technology performances of the same grade products by domestic HSPD manufacturer, CHTC JOVE pile driver is of yet some unique original technologies as follows.
1. Unique top-jacking design.CHTC JOVE HSPD can be applied by not only clamping but also jacking or the two simultaneously. This mode can reduce the clamping stress effectively to avoid damaging the hull, especially of the thin-well pipe piles.(Patent No.: ZL02139875.7)
2. Original structure design of lifting leg.
This feature has changed the supporter of radial force from the lifting cylinder of pile driver during longitudinal walking. By this way, it is possible to avoid the damage of the lifting cylinder rod and the guide thimble, improving resistance to strain injury, impulsion, and weariness greatly.(Patent No.: ZL01249443.7)
3. Practical clamping mechanism.
It can meet the needs of square pile, pipe pile and H-type steel pile only by changing the grippers. The grippers can adjust its orientation according to the pile surface to ensure enough contact to the pile, and to avoid pile damage.(Patent No.:ZL200820210908.5)
4. Ingenious conception in the design of the side and corner pile mechanism.
The side and corner piling force can reach 60%-70% of center piling force.(Patent No.: ZL02277982.5)
5. Flexible and adjustable guiding pile unit.
Original universal guiding pile mechanism, which can effectively adjust the size of the piling hole, is applicable for various shaped concrete pile. The mechanism can guarantee the safe press of the pile, reducing the labor intensity and improving construction efficiency.(Patent No.: ZL200820210907.0)
6. Unique terminal pressure-stabilized systemto ensure no float to the machine at the rated pressure, greatly improving the safety of operation.
7. Unique clamping pressure-keeping systemcan automatically fill in the fuel if the cylinder leak oil, to ensure high reliability of clamping pile and high quality of construction.
8. Walking refueling cup car original designwith durable and effective lubrication of rail wheels, extends the service life of rail wheel.
9. Constant &high flow power hydraulic system designensures high piling efficiency.
Packaging Detail:Container packaging. |
Delivery Detail:Within 30 days after the receipt of 30% deposit |