10T per day beer brewery equipment, beer factory
Processing:Fermenting Equipment,fermentation | Condition:New | Place of Origin:Shandong China (Mainland) | Brand Name:KL |
Model Number:KL-10.0 | Processing Types:Alcohol | Certification:ISO&CE |
10T per day turnkey beer equipment
Jinan Keli Machine Equipment Production Co., Ltd is a very professional beer equipment manufacturer and supplier.
we guarantee the highest quality and best price . And welocme to inquire and visit to our factory.
Mash lauter/whirlpool tank | .interior:stainless steel, with stir,steam heating |
Mach boiling tun | interior:Stainless, with steam heating |
Fermentation tank | Stainless steel, one control for each tank |
Ice water tank | Stainless steel |
Sterilizing trolley |
Specifications:
Milling System
Malt Miller
Saccharification System
Boil spin heavy pot
Saccharification filter slot
Saccharification wort pump
Saccharification pipelines and valves
Plate heat exchanger
Platinum resistance temperature instrument
Fermentation System
Fermentation tank
Fermentation pipelines and valves
Platinum resistance Temperature instrument
Refrigeration System
Glycol ice water tank
Refrigerating Unit
Ice water circulating pump
Ice water pipelines and valves
Platinum resistance Temperature instrument
Washing and sterilization System
Washing pump
Alkali liquor washing tank
Control System
Saccharification Control
Fermentation Control
Refrigeration Control
Washing Control
Accessory
Hose
Wired hose
Iron shell thermometer
Stainless steel four- way valves
Stainless steel reducing nipple
Butterfly pads
Brix plan with temperature
Inflatable head
Bad rake exit
Measuring cylinder
advantages:
1.Cylindercone botton shape and dished top head
2.Finishing:Mirror polishing (inner 3mm and outer 1.5mm)
3.Material:stainless steel 304 with low price or red copper with nice-looking
5.Quality: ISO9001:2000 and CE certificate
Please contact us for further information.
Packaging Detail:exporting standard, wrapped with black cotton or with plastic film firstly then outside by iron frame or wooden box. or according to customers' requirements. |
Delivery Detail:within 45 days after 50% T/T |