YR Stone Vibrating Feeder Rubble Crusher Machine
Condition:New | Application:Mining Machinery | Power Type:Electric | Capacity(t/h):80-200,80-120 |
Place of Origin:Hubei China (Mainland) | Brand Name:Yonran | Model Number:GZD/ZW series | Power(W):11-15 |
Weight:3980kg | Certification:CE & ISO | Warranty:Two Years Guarantee | Model:GZD-850*3000 |
Clute size(mm):850*3000 | Max.feed size(mm):400 | Power(kW):7.5 | Weight(kg):3895 |
Work:Reliable | Spare parts:Suuply for whole year | Installation:Under our engineer's guidance | Guarantee:2 years excluding the wearing parts |
YR Stone Vibrating Feeder Quarry Machine
Advantages & Features Vibrating Feeder for Rubble Crusher
1.Vibrating Feeder
2. Stable and long service life.
3. Easy to adjust.
4. Reliable operation, low noise.
5. Easy maintenance.
Structure and Operating Principle Vibrating Feeder for Rubble Crusher
While in work,Electromotor drive the Eccentric shaft move in high speed,and by the high speed,the eccentric block generate continuous centrifugal force to drive the Box frame vibarting periodically so the material
Quality and Service Vibrating Feeder for Rubble Crusher
1.The Wearing parts
We use special materials for our spare parts, like Mn13, Cast Iron, Zinc Alloy etc, For example, the Movable jaw plate, the Fixed jaw plate, the side plate of Jaw crusher are made of Mn13, which is much wear resistance than normal materials. And their usage life is longer.
2. Quality
We guaranteeTWO YEARSfor our quality. During the guarantee period, if any problem, we will check and repair it for our customerFREELY. If exceed the guarantee period, we will also check and responsible
forour customers. What's more, if the crushing plant we recommended are not satisfied to our customer's requirements, we will change the suitable machine for our customerFREELY. This is our Quality policy.
3.After-sale services
1. We will supply the most suitable crushing plant to customers according to their requirements.
2. Assist clients to prepre for the first construction scheme, we will supply the Machine Base drawing and Installation manual.
3. For the Installation, we will dispatch two or three engineers to guide the installation, take the trial test, train their worker, debug the equipment, adjust the capacity etc.
4. The regular inspection and maintenance will be supplied on time.
Packaging Detail:1.Rust prevention,2.Spare Parts:wooden packing |
Delivery Detail:10~15 days |