Waste Tire Recycling Machine
Type:Tire/Rubber Recyling | Place of Origin:Henan China (Mainland) | Brand Name:Yongle | Model Number:T YL-10 |
Green, high efficiency:Energy saving,recycle |
Process for Pyrolysis Machine:
1. Directly put the waste tires into machine, catalytic cracking processor atmospheric steam heating oil gas and the gas by condenser, liquefiable part, condensing for tyre oil, gas system through liquefaction stab processing objects bottom burned. After the end of each furnace, the cooling of the automatic door carbon residue dregs.
2. Security: Our facilities have anti-blocking device, also has pressure gauges, alarms, safety valves, vacuum equipment.
3. Low cost: Our company is located in the suburbs, all costs are lower.
4. Mature technology: oil refining industry is a special industry (high-profit), technology is important, the company engaged in oil refining for many years, has a wealth of experience to ensure user safety, and better oil yield.
Item | Details | |||
1 | equipment’s model | YL-15 | YL-18 | YL-20 |
2 | Raw material | Waste Tire | Waste Tire | Waste Tire |
3 | Structure Form | Horizontal type | Horizontal type | Horizontal type |
4 | Daily Handling capacity | 5 tons | 8 tons | 10 tons |
5 | Oil production per 24h | 2.25 tons fuel oil | 3.6 tons fuel oil | 4.5 tons fuel oil |
6 | Working pressure | Normal pressure | Normal pressure | Normal pressure |
7 | Main engine rotating speed | 0.4R /min | 0.4R /min | 0.4R /min |
8 | Equipped power | 1.5KW×2 | 2.2KW2 | 2.2KW×2 |
9 | Cooling Mode | Water | Water | Water |
10 | Consumption of Cooling water | 0.2 | 0.3 | 0.4 |
11 | Heating Mode | Direct | Direct | Direct |
12 | installation | main engine integral installation | main engine integral installation | main engine integral installation |
13 | Noise dB (A) | <=85 | <=85 | <=85 |
14 | Machine dimension | 4500*2200 | 5000*2200 | 6000*2200 |
15 | Working Mode | intermittence | intermittence | intermittence |
16 | Weight (kg) | 4600 | 5000 | 5500 |
17 | Equipment Processing Period | 20 days | 20 days | 20 days |
Packaging Detail:packages only |
Delivery Detail:10-15 Days |