Tungsten steel alloy curve shaped cutter tool manufacturer
1:Tungsten steel alloy curve shaped cutter tool manufacturing, 2:With high hardness, wear resistance and Corrosion resist - details see: https://www.machineto.com/tungsten-steel-alloy-curve-shaped-cutter-tool-manufacturer-10160026
Place of Origin:China (Mainland) | Brand Name:OEM Brand | Type:Machining Parts | Material:Tungsten steel |
Plating:Chrome | Product No:CNC lathe series/Hardware for precision parts | Dimension:OEM design and size | Material and process:milling process, Grinding process and wired EDM process |
Product origin:China | Port:Any port in China | OEM and ODM:As per as customer requirements | Our service:CNC Machining, Milling, Stamping, |
Equipments:CNC machining center, CNC lathes, General milling | Sample time:Within 5-7 days | Delivery time:25 days later after receiving the deposit |
Materials: | Aluminum , brass, tungsten alloy , Red cooper, Purple cooper, spring cooper,Titanium, PVC, Urethane, Bronze ,Plastic, Hard metal, Stainless steel, ductile iron etc |
Experience | More than 10 years of manufacturing experience |
Surface treatment | Broaching,Grinding,Drilling,Milling,Tapping,Turning,Wire EDM,CNC milling,Casting,Bending,Punching,fitting, welding. |
Euipments | A:Grinding machine: 16SetsB:Milling machine:7 setsC:Wire EMD machfine:16 stesD:CNC machine: 2 sets E:CNC computer gong machine: 1setF:welding machine: 2setsG:punching machine: 2 setsH:EDM machine:2 sets |
Specification | Products manufactured according to customer's drawing or samples |
Tolerance | 0.01mm |
Lead Time: | 10-35days after receiving the deposit depends on your requirements and quantity |
QC System: | In house,coming inspection,first off,spotcheck in processing ,final inspection, 100% inspection for critical dimension; |
Packagings: | 1) Standard package, |
2) Pallet or container, | |
3) As per customized specifications. | |
Payment Terms: | 100% T/T for sample order. For production,30% as deposit before massive production and the balance ispaid before shipping. |
Shipment Terms: | 1) 0-100kg: express air freight priority, |
2) >100kg: sea freight priority, | |
3) As per customized specifications. |
Different point of view
A:Front view
B:Side view
C:Up view
D:Down view
OEM service
Size
Packaging Detail:Each piece into bag for protection then with inner box packing and last master carton |
Delivery Detail:25 days later after receiving the deposit |