Supply Steel Post Driver for PV Installation
Condition:New | Efficiency:high efficiency | Piling Speed(m/min):1-2 m/min. | Place of Origin:Jiangsu China (Mainland) |
Brand Name:ROADSKY | Model Number:YZ180 | Weight:2000 kg | Dimension(L*W*H):2350*2200*3600 mm |
Certification:ISO 9001:2000 | After-sales Service Provided:Engineers available to service machinery overseas |
1. Function
1.1 Pile Driving Function: YZ180 Steel Pile Driver for Photovoltaic Installation is designed to install the highway anti-collision guardrails and guardrail post, especially be applicable for driving road side guardrail post in newly constructing highways. It is also used for the photovoltaic installation, solar cells and solar panels installation.
2. Features
2.1 YZ180 Steel Pile Driver for Photovoltaic Installation is composed of chassis, upper column, press arm, hydraulic system, hydraulic hammer, diesel engine, electric system, cooling system and control system. It has the characters of quick and exact positioning, compact size, lightweight, self-propelled, quick moving, humanized design, easy operation, high efficiency and low price.
2.2 The upper column is articulated with the main column. When you use a tow truck or trailer to tow the machine to the working site by the towing device with high speed, first you need to lay down the upper column by articulate and disassemble the traveling roller chain. The up and down, longitudinal and transverse shift, horizontal slide of the column are realized through hydraulic system.
2.3 The hydraulic hammer is installed at the front end of the press arm. The press arm carries the hammer downward and upward along the track of the column for post driving working by hydraulic system. You can not use the upward force of the hammer to extract the posts out of the ground directly or it may damage your machine, we suggest you to choose our professional Pile Extractor for extracting the posts out of any kind of ground.
2.4 It has very famous brand diesel engine Changchai with electrical starting equipped, which has a stable performance, simple operation and maintenance and very long service life.
2.5 The control system is equipped with multiple directional control valve and centralized hydraulic control rods which makes the operation simple and convenient.
2.6 It can install piles up to 3m (9.84’) in length, but on request the machine can be supplied with extension columns which can install piles up to 3.5m (11.48’) or even 4m (13.12’) long.
3.Main Technical Specifications
Type | YZ180 |
Rated Power | 22 KW |
Size (L×W×H) | 2350×2200×3600 mm |
G.W. | 2000 KG |
Weight of Hydraulic Hammer | 260 KG |
Dia. Of Drill Shank | 65 mm |
Hydraulic System Pressure | 16 Mpa |
Hydraulic System Flow | 45-50 L/min. |
Impulsive Pressure | 10-13 MPa |
Impulsive Frequency | 5.8-13 Hz |
Wheel Track | 1670 mm |
Pile Driving Force per Stroke of the hammer | Around 200 KN |
Working height of hydraulic hammer | ≤3000 mm |
Traveling Speed | 0-15 km/h |
Tow Speed | Around 60 km/h |
Packaging Detail:Export and sea-worthy standard special packing |
Delivery Detail:10days after receiving the advance payment |