Soil sand gravel power rammer/tamping rammer
Condition:New | Place of Origin:Henan China (Mainland) | Brand Name:TYM | Model Number:HCR |
Certification:ISO&CE | Application:soil, sand, gravel, etc. | Certificate:ISO9001:2000 | Warrenty:1 year |
Application:
Widely used in road construction, pipeline construction, municipal engineering, bridge pier, courtyard, rail bed, suburb and narrow fieldwithout electricity.
It is used to tamp variousgravelandsand, and also can be used to tampasphalt, concreteandclay. The tamping performance is especially good for tamping clayed soil.
MainFeatures:
1. Our tamping rammer is with advanced design, stable performance,strong tamping force,easy operation, safe using, wide application andhigh efficiency.
2.Secondary Filtration System, which can purify the air over 99%of dust and prolong the engine life;
3.Dust off corrugated box (Bellows),the material is fromGerman BSFand itsservice time is over two years.
4.Crankcase, which is made ofaluminum alloy.
5. Oil Pointer, which can avoid excessive fueling and is by one-time precision casting.
6.Gears, which is made of20 Cr-Mn alloy steel, forged by nitriding, the internal organizational structure mostly optimized, high strength and wear resistant.
7.Ram Plateis made ofwoodin the middle andsteelup and down side, which combo canreduce vibrationeffectively;
8.All the parts (Including Oil Tank, Gear Box, Bellows, Oil Pointer, and Ram Plate)are exchangeable with Japan Mikasa's Tamper, we sell parts individually.
Technical parameter:
Model | HCR70A | HCR70A-1 | HCR90 |
Power | 2.2kw / 4000r/min | 2.2kw / 4000r/min | 2.9kw / 4000r/min |
Walking speed | 17 m/min | 17 m/min | 17 m/min |
Types of engine | HONDA G×100 | 156FA HUASHENG ENGINE | ROBIN EH12-2D |
Impact frequency | 600r/min | 600r/min | 600 |
Dimension | 0.09m2 | 0.09m2 | 0.09m2 |
Net Weight | 72kg | 76kg | 72kg |
Packing Size | 1000×820×420mm | 1000×820×420mm | 1000×820×420mm |
Power rammer:
Power rammer used in road construction:
Packaging Detail:International packing standard |
Delivery Detail:7-15 days after receiving the deposit |