Sheet Metal Assembling Parts
Place of Origin:Zhejiang China (Mainland) | Brand Name:Xinlin | Model Number:XL-SUS3 | Surface treatment:Oxidation Treatment |
Assembly Part
Specification:
1)Material:SPCC, SGCC, Stainless Steel, Carbon Steel, Mild Steel, Aluminum, Aluminium Alloy etc.
2) Applied software for specification drawings: PRO/E, Auto CAD, Solid Works and CAM/CAE.
3)Main poduction machine: Laser cutting machine,punch,welder,CNC bending machine etc.
4)Surface treatment: Zinc/Nickel/Chrome Plating, Galvanization, Powder Coating, Plastic Spraying.
5)Product range: sheet metal fabrication, auto parts, motorcycle part, construction hardware, metal cabinet etc.
6)We win our customer by excellent quality,competitive price,prompt delivery,great service and solid reputation.
NOTE:
One of our features is that products are customized according to clients' requirement!!
PROCESS:
Laser cutting→Punching→Stamping→Oxidation Treatment→Packing
Custom Sheet Metal Fabrication
Sheet Metal Fabricator
1.A 16000 sq meters modern factory unit and high technology plant
2.CNC laser cutting and shearing:
Low Carbon steel,Mild steel Q235,High tensile Steel Q345,Galvanized steel sheet.
Aluminum5052,Aluminum 6061,Aluminum 6063,
Stainless steel 304,Stainless steel 201,Stainless steel 430,Alloy Steel etc.
3.Prototype design and development to full production:
Solidworks 2012
Auto CAD 2012
Pro/ENGINEER 5.0
4.Full approval of ISO 9001:2008
High quality supplier for the Canton Fair
Apply ISO 9001:2008
TUV Factory Audited
5.Precision CNC Machined
CNC lathe,CNC Milling
6. Welding
Tig welding
Mig welding
Touch welding
7.Full mechanical assembly
Assembly all the parts together according to you requirement.
8.Comprehensive range of finishing and painting
Powder coating based on your RAL number or color sample
Plating zinc(White zinc,Colorful zinc) ,Chrome,
Sandblasting to clear the surface,remove the burrs
Anti-rust treatment
Warehouse
Shipping With Container
Package:
Our workshop:
Packaging Detail:Standard Exporting Package ----Wooden Case |
Delivery Detail:25 days after having your down payment. |