SC100/100 construction hoist

SC100/100 construction hoist, 1.Outdoor construction hoist, 2.Complete safety device, 3.Spare elevator parts - details see: https://www.machineto.com/sc100-100-construction-hoist-10098078
Condition:NewPlace of Origin:Shandong China (Mainland)Brand Name:BetopModel Number:SC100/100
Rated Loading Capacity(kg):1T/cageHoisting Speed:33m/minMax Lifting Height:250mDimension(L*W*H):3.0*1.3*2.2
Loder Weight:2TAfter-sales Service Provided:Engineers available to service machinery overseasColor:Red/blue/silver/orangeMain electrical system:Schneider
Sling Type:Rack and pinionCertificate of quality:ISO9000,CE,GOST, Korea StandardModel of fall arrestor:SAJ4.0~1.2Service:Installation technique
Usage:Special for high-rise building's constructionType:SC100/100 construction hoistSurface treatment:blasting,Baking finished ,galvanize,PaintingMaximum Lifting Weight:2000kg
SC100/100 construction hoist
contact supplier for SC100/100 construction hoist


SC100/100 construction hoist

Protective Measures of construction hoist:

1. A Master switch On the operation board: When the button closed, unexpected action to other buttons can not let cabin working.

2. Anti-falling safety device(with Centrifugal breaking system ): When all other protection device losing action, it can brake the cabin from falling.

3. Mechanical inter-locking door: when the cabin running it can close by itself from protecting people from dropping.

4. Overload calling device.

5. upper and lower travel limit:They can limit the cabin go over the top mast.

6. The top mast section have no rack in order to limit the cabin overrunning and dropping .

7. Manual button:You can operate the botton to let the cabin go down when interruption of power supply .

8. Emergency switch: When the cabin losing control and over-runing, you can operate the button.

Main technical parameters of construction hoist:

1.Construction hoist of common models:

CharacteristicModelRated LoadingLifting SpeedMotor Power

Double cabin

SC200/2002×2000kg33m/min2×(3×11kw)
SC150/1502×1500kg33m/min2×(2×15kw)
SC100/1002×1000kg33m/min2×(2×11kw)

Single cabin

SC2002000kg33m/min3×11kw
SC1501500kg33m/min2×15kw
SC1001000kg33m/min2×11kw

2. Construction hoist with Interver :

Characteristics

ModelRated LoadingLifting SpeedMotor Power

Double Cabin

Low-speed

SC200/200D2×2000kg0-33m/min2×(3×11kw)
SC100/100D2×1000kg0-33m/min2×(2×11kw)

Mid-speed

SC200/200Z2×2000kg0-55m/min2×(2×11kw)
SC100/100Z2×1000kg0-55m/min2×(2×11kw)

Single

Cabin

Low-speed

SC200D2000kg0-33m/min3×11kw
SC100D1000kg0-33m/min2×11kw

Mid-speed

SC200Z2000kg0-55m/min2×11kw
SC100Z1000kg0-55m/min2×11kw

Products details:

1. Productiong process: Strict material selection— blanking— inspection — welding—inspection— Blasting — inspection —Baking finished or galvanized— inspection —Finishedproduct

2. The product can be customized according to customers'requirements (drawing, specifications and so on)

A: The cage is boarded up by all punched aluminum sheet

B: Main structure of cage is made of high-quality steel after bending.

C: The Mast section is made of seamless pipe

D:Access door interlock device protect the safety of people and materials

E: Equiping with fall arrestor device

F:Equiping with interver in variable frequency construction hoist

Workshop and transport details:

1.All Production Line adopt standard of the fixture, mould, gauge

2. Workshop 5S mangement style

3.Each Construction Elevator should be testing-run and adjustment in Factory

4.Different driven system

5.Construction Site

6.Transport to Qingdao(China) port

7.Exhibition in Qingdao(China) port

8.International certification

Reliable product quality, price guarantee minimum market, Welcome partners to plant

inspection , study, consultation, business negotiations,and plans to sample processing.

SC100/100 construction hoist
Packaging Detail:Construction hoist seaworthy container shipment in nude(40HQ)
Delivery Detail:within 15 days after confirm the order

Related Product for SC100/100 construction hoist