Sand dredger

Dredging depth 15m, Distance 1500m, Capacity 700 cbm, Delivery time 30 days, Dregger tested in the factory teting center - details see: https://www.machineto.com/sand-dredger-10312113
Condition:NewType:Cutter Suction Dredger,Hydraulic dredger and diesel enginePower Type:DieselDredging Depth:15 m,15m at maximum
Draught:170 cmPlace of Origin:Shandong China (Mainland)Brand Name:Haiyang DredgerModel Number:HLC450
Dimension(L*W*H):27x8.5x2.5mWeight:180TCertification:ZC or CCSWarranty:1 year
After-sales Service Provided:Engineers available to service machinery overseasFunction:sand dredging or desiltingDelivery:30 days after down payment receivedCertifcate:ZC or CCS
Power:Diesel oil or electricitySteel:CCSBEngine:Cummins enginePump:Shijiazhuang
Capacity:700 cubic meter per hour   
Sand dredger
contact supplier for Sand dredger


1. Company profile and product introduction

Qingzhou Haiyang owns blanking workshops, gold panning machinery processing workshops, machining workshops, anti-corrosion workshops, general assembly workshops, product debugging and testing centers.

The products are of a great variety including800—20000m3/h large scale dredging and sand mining

equipments. We can also design and produce special types of machinery according to customers’ requirements.

Technical specifications

Item/modelHCL350HLC400HLC450HLC500HLC600
Pump size14inch18inch18inch20inch24inches
Water flow3000m3/h3500m3/h4000m3/h6000m3/h8000m3/h
Capacity600CBM/h700CBM/h800CBM/h1200CBM/h1600CBM/h
L*B*H23.5*7.5*2.4m23.5*7.5*2.4m23.5*8*2.4m26*8.5*2.6m29*10*3.0m
Dredging depth15m15m15m15m15m
Average draught1.6m1.6m1.6m1.7m2m
Discharge distance1500 m1500m1500 m2000m2500m
Dia.suction/discharge pipe550/500mm610/550mm630/570mm680/650mm810/780mm
Pump size16/14GH450WN450WN500WN600WN
Diameter of cutter headΦ1550mmΦ1550mmΦ1700mmΦ2200mmΦ2450mm
Main engine1000kw1050kw1200kw1580kw2400kw
KTA38KTA38KTA50N/AN/A
Dia.oil cyclinder160mm160mm160mm200mm250mm
Item/modelHCL200HLC250HLC250AHLC300HLC300A
Pump size8inch10inch10inch12ich12inch
Pump flow800m3/h1100m3/h1500m3/h2000m3/h2500m3/h
Capacity160CBM/H220CBM/H300CBM/H400CBM/H500CBM/H
L*B*H15.5*7.2*2m15.5*7.2*2m15.5*7.2*2m21*7.5*2m21*7.5*2m
Dredging depth8m10m10m10m10m
Draught1.3m1.3m1.3m1.4m1.4m
Distance600m1000m800m1200m1200m
Dia.suction/discharge pipe325/300mm350/350377/377mm426/410460/420mm
Dia.cutter headΦ1100mmΦ1100mmΦ1100mmΦ1300mmΦ1300mm
Main engine power258kw300kw450kw600kw650kw
Dia.cyclinder100mm100mm100mm160mm160mm

2. Working site abroad

1)The sellerwill send 2-3 qualified and experienced engineers tothe buyer’sworkplace to direct and guide thecutter suctiondredger'sinstallation and training workers operating.

2) To assist in the installation, the buyerwill arrange for 6-8 workers to aid these engineersin the process of installation.

3)Usually installation is expected to take 10-20 days.

4)The seller’sengineers must arrive atthe buyer’sdesignated place within 3 days after thecutter suctiondredger has been transported to the workplace.

5) After the dredger's complete installation,the buyerwill coordinatethe seller’sengineers to test dredger's performance in appropriate water. Dredger Test includes: operation of thesand/muddredging, hydraulic and electrical systemsoperating, running of the dredger's outfitting equipment, andthe seller’sengineers' debugging of the dredger's natural workin daily working.

6)The buyerwill be responsible for givingthe seller’sengineers and translator: accommodation, food, visa, roundtrip travel tickets and a wage per day for each person. Ifit is the seller’serror causes the installation time to exceed 20 days,the buyerwillnotpay a salary. Ifit is the buyer’serror makes the installation time take more than 20 days,the buyerpays cost by themselves.

7)The buyer’sworkers will followthe seller’s engineers’proper arrangement. To ensure the smooth installation of the dredger,the buyerwill guarantee thatthe seller’sengineer’s return to China within 3 days after the dredger has been installed and tested successfully.

3. Transportation to the port from factory

After the testing, the dredger is dismantle and repainted again, then packing for transportation. The transportation is divided into 2 parts, one is from the factory to the Tianjin port, and the other is from Tianjin port to the destination port.From the factory to the Tianjin port, trucks are using for transportation. Detailed transportation list and drivers information will be recorded before leaving the factory.

Because pontoons of dredger are designed wider and longer, they are transported in bulk vessel from the sea. And also in the transportation process, pontoons are anti-corrosion paint, then it doesn’t matter which place they will be put, in the deck or at the bottom of the vessel.Lug andsafe point hoist have been designed on the deck of the pontoon; it is convenient for loading and unloading.

4. Engine room inside

Engine roomis the heart of the dredger. There are equipments inside: main diesel engine, auxiliary diesel engine, dredging pump, gear box, coupling, generator, hydraulic system, and different cables for connection.

In order to have good connection and performance, different foundations are designed to put the dredging pump, the engines and the coupling; around the foundation, there are also frames designed as supportive of foundation.

On the wall, a lot of compartments are designed for tools; i is convenient for repairing and maintaining.

According to our practice in the last 20 years, the engine room needed to be designed wider and bigger. That’s because in the working process of the cutter suction dredger, engines and dredging pump and generator need checked and supervising. And in case of emergency, it is easily for walking.

5. Customer visiting and negotiating

6. Testing center before ex-factory

Length of the testing center is 60m, width is 28m, and depth is 8m.

In order to guarantee good performance and safety of our cutter suction dredger, all our products will be tested in the testing center before ex-factory. It is tested like the machine working in the customer’s working site. Performance and safety will be tested and recorded in the testing process.

Before one day of the testing, engineers from different equipments of suppliers will be in the factory to assist the testing, for example, engineers from Cummins engine Chonging; engineers from dredging pump company,; engineers from generator company. Usually, before 5 days for the testing, the seller will inform the buyer for supervising the testing process before dismantle the dredger.

For the testing, totally is 5 days. The 1stday is testing thesealing and anti-corrosion painting of the 3 pontoons; the 2ndday is hydraulic system testing; the 3rdday is main engine and auxiliary engine testing when dredger in the condition of working; the 4thday is hydraulic cutter driven system in the operating room, and the 5thday is dredging pump testing in different pressures of water flow.

In the testing process, there are may be natural reasons for testing stopping, for example, raining and snowing. So the testing may be extended to 10 days at most.

After testing, dredger will be tug out from the testing center for dismantle and shipping. After the dredger dismantle, 3 pontoons will be repainting, because in the testing process, there will be oil on the deck and pontoons.

7. 3D drawings

Sand dredger
Packaging Detail:In bulk
Delivery Detail:50 days after down payment received

Related Product for Sand dredger