PVC Fill For Cooling Tower
Condition:New | Cooling Type:Counter Flow | Material:Metal | Place of Origin:Shandong China (Mainland) |
Brand Name:Hengan | Model Number:BNX | Voltage:220 | Power(W):110-220v |
Dimension(L*W*H):2500*2410*4050 | Weight:1-10t | Certification:CE,ISO,BV,CCC,etc | After-sales Service Provided:Engineers available to service machinery overseas |
PLC:Omron,Siemens,ABB | Flow Rate:Q=65m3/h | Motor:Siemens | Electrical Components:Schneider |
Install:A engineer will be sent to you | Color:As customer requirements | Circulation pump:15 KW * 2 PCS | Spray pump:3.0 KW * 1pc |
Wind machine:4 KW * 2pcs | Type:Water Closed Cooling Tower |
PVC Fill For Cooling Tower
I. Product: PVC fills for Cooling Tower ,Film Packing
Package: Nake Pakage
Payment, T/T
MOQ,20 CUBIC METERS
Weight: 18Kgs/Cubic Meter
Material: PP,PVC,FRP
Thickness: 0.25-0.65mm
II. Outstanding Features:
1, heat performance is good, cooling efficiency
2, good, ventilation resistance small hydrophilic
3, installation is convenient, easy to clean, the transportation is convenient
4, big "honeycomb structure design has the role of flow",
Length(mm) | Height(mm) | Film thickness(mm) | ||||
Size | Tolerance | Size | Tolerance | Size | Tolerance | |
“S” Wave | 1000 | ±10 | 500 250 | ±5 | 0.4 | ±0.05 |
2000 | ±10 | 500 250 | ±5 | 0.4 | ±0.05 | |
Double Inclined | 1000 | ±10 | 500 250 | ±5 | 0.4 | ±0.05 |
Inclined Wave | 1000 | ±10 | 500 | ±5 | 0.4 | ±0.05 |
Heng An Radiator Group |
Heng An Radiator Group, established in 1975, specializing in research and production of water, oil and air cooling systems, is one of the top radiator bases in China. More than 900 employees now. Our engineer can design the cooling tower based on client situation.
Heat treatment cooling tower Metallurgical Industry cooling tower Center Air-condition Cooling tower Gas industry cooling tower Oil industry cooling tower Pharmaceuticals industry cooling tower Coal Chemical Industry cooling tower Emulsion cooling tower
|
Contact Person |
Packaging Detail:container for PVC filler for cooling tower |
Delivery Detail:in 30 days |