PTV8W Constant Pressure Expansion Valve (Hot gas bypass)

PTV8W Constant Pressure Expansion Valve (Hot gas bypass) :, 1) Connection: Inlet-1/2 SAE, Outlet-5/8 SAE. - details see: https://www.machineto.com/ptv8w-constant-pressure-expansion-valve-hot-gas-bypass-10247283
Place of Origin:Shanghai China (Mainland)Brand Name:FENSHENModel Number:PTV8WType:Refrigeration Compressor
Application:Refrigeration PartsCertification:iso9001Item name:PTV8W Constant Pressure Expansion Valve (Hot gas bypass) 
PTV8W Constant Pressure Expansion Valve (Hot gas bypass)
contact supplier for PTV8W Constant Pressure Expansion Valve (Hot gas bypass)


PTV8W Constant Pressure Expansion Valve (Hot gas bypass) can adjust compressor capacity and make it match with the load of evaporator.
Placed in a bypass between high and low pressure side of refrigeration system, PTV8 imposes a lower limit on compressor suction pressure by supplying the low pressure side with replacement capacity in the form of hot or cool gas from high pressure side,
Features :
1) Exquisite angle design for easy installation.
2) Accurate adjusting pressure.
3) Wide capacity and operating ranges.
Technical data
Max. working pressure: 2.5MPa
Max. testing pressure: 3MPa
Type and data

Model

Normal capacity (KW)

Connection

(in.)

Adjusting

range (MPa)

Medium

temperature

(°C)

Max. working

pressure

(MPa)

Max. testing

pressure

(MPa)

R134aR22/R407CR404A/R507InletOutlet
PTV871173/8 SAE1/2 SAE

0.03→0.6

-25~150

2.5

3

PTV8W71173/8 ODF1/2 ODF
PTV10W1422.516.21/2 ODF5/8 ODF
PTV12W3040251/2 ODF5/8 ODF

Notes: 1) Nominal capacity is based on evaporating temperature +5°C, condensing temperature +38 °C.

2) After the model, ”W” indicates solder ODF,”E” indicates external equalization.

3) Factory setting opening pressure is 0.4MPa. Adjust regulation knob at clockwise rotation for one round, opening pressure

increases 0.1 MPa, inversely, opening pressure decreases 0.1 MPa.

PTV8W Constant Pressure Expansion Valve (Hot gas bypass)
Packaging Detail:PTV8W Constant Pressure Expansion Valve (Hot gas bypass)packing with cartons
Delivery Detail:3-5 working days

Related Product for PTV8W Constant Pressure Expansion Valve (Hot gas bypass)