professional 18 inch cutter suction dredger
Condition:New | Type:Cutter Suction Dredger | Power Type:Diesel | Dredging Depth:20 m |
Draught:170 cm | Place of Origin:Shandong China (Mainland) | Brand Name:Dingke | Model Number:wn450 |
Dimension(L*W*H):45m*7.8m *6.1m | Weight:145 tons | Certification:ISO 9001 | Warranty:1 year |
After-sales Service Provided:Overseas service center available | Technical:Full hyfraulic | Application:Sand and mud dredging | Pump flow:3800m³/hr |
Output:600m³/hr(15% consistence) | Max dredging depth:12m | Discharge distance:1200m | Average draught:1.50m |
Structure:Can be dismantle and assemble at working site | Product condition:Semi-finished |
18 inch cutter suction dredger
1.Main parameters
Total length:48m
Model length:28m
Total width:7.80m
Model depth:2.5m
Suction/Discharge pipe diameters:650/600m
One main pontoon:28.00*3.80*2.50m
Two side pontoons:20.00*2.60*2.30m
2.Working principle
1). Dismantle type of the whole hull
2). Main equipments are swing equipments, ladder equipments, spuds equipments and deck equipments and so on.
3). Pump is driven by diesel engine through reduction gearbox.
4). Auxiliary engine provides pressure oil for winch, cutter and cylinder and hydraulic pump.
5). “Rest” generator set will supply lighting and emergency electricity utilization.
6).Cutter is driven by the motor, the cutter bearings is equipped with lubricated sealing device.
7). The spuds swing alternately to make the dredger forward, which is lifted by hydraulic cylinder.
This dredger is manufactured according to the geographical condition in order to satisfy mining working requirements in camouflage water area
(inland river and small wave water body) It is a removal dredger made up
of whole steel.
The Cutter Suction Dredger of steel construction, the non-self-propelled, dismountable type, is able to berth and dredge at any waters both in the coastal area and inland rivers.
It's hull consists of a main pontoon and two side pontoons. It is to be easy to dismantle or mount for
Transportation by road, rail or water, and is to be easy to reassemble at project site.
Packaging Detail:bulk or in the containers |
Delivery Detail:within 30-60 days after received the deposite |