Mining Equipment-Vibrating Chute Feeder For Mineral Processing
Condition:New | Application:Ore feeding | Power Type:Electric | Capacity(t/h):10-90t/h |
Place of Origin:Shandong China (Mainland) | Brand Name:Baofeng | Model Number:CG- | Power(W):Depends |
Dimension(L*W*H):Depends | Weight:535-1710KG | Certification:ISO | Warranty:1 Year |
After-sales Service Provided:Engineers available to service machinery overseas | Color:Determined by the customer |
Main introduction of chute feeder
Chute feeder is widely used in mining. In the mining line, Chute feeder is generally installed in front of the primary crusher. It can send the big ore to crusher evenly and continuously.
Chute feeder can effectively control the feeding capacity to match with the capacity of the whole crushing plant.
Notes: The motor can be replaced by speed adjustment motor to adjust the feeding capacity according to the customers’ requirements.
Structure and working principles
1,Motor 2,Reducer 3,eccentric mechanism 4,idler 5,chute frame
The devices are installed on the bottom of the ore bin outlet, the ore fall onto the leakage board at the chute bottom, the bottom of the leakage board is fixed on the idler, and through the eccentric institutions to connect the leakage board and the reducer together, and then through the coupling lined the motor. During the operation the motor drive the reducer through the coupling, and through the eccentric dish and the leaking plate, which is at the bottom of the frame also between the idlers, to move in reciprocating linear way, and achieve the feed uniformly.]
Some pictures of chute feeder
Technical parameter
Type | CG-400*400 | CG-600*500 | CG-1240*980 | |
Outlet (L×W) (mm) | 400*400 | 600×500 | 1240*980 | |
Capacity t/h | 10-30 | 10-50 | 39-90 | |
Max feed size (mm) | 100 | 200 | 250 | |
Motor | Model | Y112M-6 | Y112M-4 | Y160M-6 |
Power | 2.2 kw | 4kw | 7.5 kw |
Usage in dressing plant such as gold, iron, copper, etc
Attention:
1. Double-check whether the bolts of the equipment and hopper are fastening or not.
2. Check whether the all the lubrication point is full of lubricating oil.
3. No allowing too much ore on the chute when start the equipment, it can feed ore only after the normal operation of equipment.
4. Adjust the eccentricity of the feeder’s two sides to the same, and the amplitude is no less than 5~5mm.
5. Before stop the equipment first should stop feeding, the electrical motor can be shut down only after all the ore are discharged.
Packaging Detail:Container, in bulk or others as the buyer's requirment |
Delivery Detail:10-30 days |