Mine drilling mud circulation purification system

-Modular design, -Can be designed to be self-propelled device, -Improve the physical and chemical properties of drilling fluid - details see: https://www.machineto.com/mine-drilling-mud-circulation-purification-system-10318883
Place of Origin:Tianjin China (Mainland)Brand Name:Sea EnergyModel Number:SE500GPMCondition:New
Tank surface:Anti-corrosive paintMaterial:National standard steelElectric control system:Explosion proofLink bolts:SS304 material
Mine drilling mud circulation purification system
contact supplier for Mine drilling mud circulation purification system


Drilling mud tank system is very important for drilling well, it is the key of excellent drilling well.

1. We can design and manufacture ZJ20, ZJ30, ZJ40, J50, ZJ70 etc mud tank system

2. Mud cleaning equipment included: shale shaker, vacuum degasser, mud cleaner, desander, desilter, centrifuge, mud agitator, jet mud mixer, shear pump, sand pump, ignition device, mud tank etc.

3. Modular design, configure the device according to the drilling depth

4. For saving space and easy transportation, mud tank system can be designed in the trailer

Mud cleaning system is used in the petroleum drilling well,, but it is developed to other working area like Horizontal Directional Drillng(HDD), Coal Bed Methane(CBM) or Coal Seam Methan(CSM), Geothermal engineering, Shield project, Dredging works, Mining etc. The models include: 80GPM, 200GPM, 350GPM, 500GPM, 800GPM, 1000GPM, 1500GPM etc, can design the handling capacity of mud cleaningsystem according to the customer's requirements.

SE500GPM standard mud cleaning system

NoNameModelQuantity
1Mud tank9.5 × 2.3 ×1.8m1
2Shale shakerSEZS7031
3Mud cleanerSEPF701
4Submersible slurry pumpYZ100-301
5Sand pumpSB5X4-142
6Jet mud mixerSESL150-401
7Mud agitatorSEJ7.51
8Mud gunNJQ1
9

Electric control system

1 set
10

Lights

3 set
11

Attachment

1 set

Mining mud cleaning system

Mining 500GPM solid control system

Vehicle-mounted mud cleaning system

Mine drilling mud circulation purification system
Packaging Detail:No package
Delivery Detail:About 45 days

Related Product for Mine drilling mud circulation purification system