Maintenance Use Synchronous Chip Sealer Can Spraying Bitumen with Stone Together

Synchronization sprayed asphalt and stones together,, Chippings spreading more evenly,, Heating is more secure, more reliable - details see: https://www.machineto.com/maintenance-use-synchronous-chip-sealer-can-spraying-bitumen-with-stone-together-10118607
Condition:NewPlace of Origin:Zhejiang China (Mainland)Brand Name:ICOMModel Number:ZQZ5311TFC
Dimension(L*W*H):12000*2496*3730Weight:31000kgName:Synchronous chip sealerCHASSIS:ZZ1317N4667D1H
Engine model:D10.34-40Max. power:249kwTank capacity:8000LChipping capacity:12000L
Bitumen pump:QGB450Hydraulic pump model:CBQ-F563Controller model:ZM-3DBurner model:G20
Maintenance Use Synchronous Chip Sealer Can Spraying Bitumen with Stone Together
contact supplier for Maintenance Use Synchronous Chip Sealer Can Spraying Bitumen with Stone Together


SYNCHRONOUS CHIP SEALER

PARAMERER

Mass parameter:

Kerb Weight(kg)

21200Total Weight(kg)31000

Rated loading Weight(kg)

9670Dimension(mm)12000×2495

×3730

Chassis Parameter:

Chassis Model

ZZ1317N4667D1HTyre model12.00R20

Wheelbase(mm)

1800+4600+1350Tread (mm)2022/1830

Front Overhang(mm)

1500Rear Overhang(mm)2750

Approach angle,Departure angle

20°/13°Minimum Ground Clearance (mm)205

Engine parameter:

Engine model

D10.34-40ManufacturerChina Heavy Duty Truck Group Co., Ltd.

Max.Power(kw)

249Max. Torque(N.m)/

Fuel

DieselDisplacement(ml)9726

Chip sealer specification:

Tank Capacity(m³)

8

Chippings Capacity(m³)12
Hydraulic pump model

CBQ-F563

Spray width3500mm
Hydraulic motoe

L2F63W2P2(LIYUAN)

Spray Value0.5-3.0(Kg)
Controller

ZM-3D

Insulation Thickness50mm
Generator(Converter)

YT6800E(YITENG)

Nozzles28
Asphalt pump

QGB450(SHANGGUI)

BurnerG20(Riello)

Other parameter:

Max. truck speed(km/h)

90Max. Grade ability>23%

Spring films(Front/Rear)

9/12Minimum turning diameter (m)15.4
Axis No.3(6*4)

TECHNICS

CERTIFICATION

PICTURE

CONSTRUCTION

Maintenance Use Synchronous Chip Sealer Can Spraying Bitumen with Stone Together
Packaging Detail:nude, Surface injecting the wax
Delivery Detail:45 days

Related Product for Maintenance Use Synchronous Chip Sealer Can Spraying Bitumen with Stone Together