LMR2000 Pulverized Coal Burner

LMR2000 Pulverized Coal Burner, 1. Environment Friendly, 2. High Temperature Flame, 3. Coal Cost Save, 4. Could Work 7*24 Hours - details see: https://www.machineto.com/lmr2000-pulverized-coal-burner-10359408
Place of Origin:Henan China (Mainland)Brand Name:LONTTOModel Number:LMR2000Condition:New
After-sales Service Provided:Engineers available to service machinery overseasPower:97.25 KWCoal Consumption:2000 kg/hMixtureTemperature:130~180 C
Coal Powder Crusher:FMJ120+FMJ40Oil Igniter:RYDHPower Cabinet:PD160Coal:Bituminous Coal
Working Temperature:800~1000CPackage:In ContainerColor:White 
LMR2000 Pulverized Coal Burner
contact supplier for LMR2000 Pulverized Coal Burner


LMR2000 Pulverized Coal Burner

LMR pulverized coal burner with a specially designed multi-stage air-driven structure to speak out of turn, can produce in a short time so that high-temperature pulverized coal swirl with burning completely, heat utilization high, smoke dust, efficient energy saving, improvement of working conditions, reducing labor intensity, etc., LMR coal burners are ideal for energy saving and environmental protection products.

ModelPower (KW)Coal Consumption (KG/H)Asphalt Plant Capacity (T/H)Mixture Temperature Control

(°C)

LMR50031.2545025-40

130-180

LMR100041.25100070-85
LMR150073.751500100-125
LMR200097.252000140-170
LMR3000138.452860200-250
LMR4000202.453660280-320

Requirements of the Coal

  1. Igniting Oil: 0# Diesel Oil
  2. Requirements of the Coal: Bituminous Coal

(1) Calorific Power > 25KJ

(2) Volatile Content≥25%

(3) Ash Content 8-10%

(4) Moisture 3-4%

(5) Sulfur Content≤1%

(6) Granularity≤20mm

The Cost Comparison between Oil Burner and Coal Burner

For example: one 160TPH Asphalt mixing plant is operated 10 hours everyday.

Oil burner

Diesel Oil Consumption: 7*160*10=11200 (kg/day)

Electricity Consumption: 30*10=300 (kw.H/day)

Total cost (RMB): 6*11200+0.8*300=67440 (RMB), as well as 991 USD

Coal burner

Bituminous coal consumption: 2*160*10=19200 (kg/day)

Electricity consumption: 98*10=980 (kw.H/day)

Four labors salary: 4*10*8.5=185 (RMB/day)

Total cost (RMB): 19200*0.8+980*0.8+180=16324 (RMB), as well as 2400 USD

The Coal Burner will save fuel cost everyday than the Oil Burner:

67440-16324=51116 (RMB), as well as 7518 USD

LMR2000 Pulverized Coal Burner
Packaging Detail:All the Components are Packaged in the Wooden Box for Export
Delivery Detail:10-15 Working Days after the Customers' Order

Related Product for LMR2000 Pulverized Coal Burner