KZB800 Cut and Pillow-type packing machine
Type:Wrapping Machine,Packing Machine | Condition:New | Application:Food | Packaging Type:PLY WOODEN CASE |
Packaging Material:Wood | Driven Type:Electric | Power:4.2kw | Place of Origin:Shanghai China (Mainland) |
Brand Name:YINRICH | Model Number:KZB800 | After-sales Service Provided:Engineers available to service machinery overseas | type1:cut type |
type2:pillow type |
KZB800 Cut and Pillow-type packing machine
Automatic controlled by PLC
Can be combined with the production line. It improves efficiency, hygienic
High precision, strong sealing performance, high stability
Main technical specifications:
Production Capacity | 500pcs/min |
Packing Shape | Rectangle, square, cylindrical |
Packing specifications | Length20-40mm, Width12-20mm,Height16-12mm |
Gross Power | 4.8kw |
Power | 220v/50hz |
Gross Weight | 1350kg |
Dimensions(L×W×H) | 2350×900×1600mm |
DELIVERY DATE:
Within 35 days upon the receipt of the down payment
DELIVERY:
Ex. Our Works at Shanghai China
TERMS OF PAYMENT:
40% by T/T as the down payment, the balance shall be issued a L/C at sight confirmed by the Seller's bank, and to be paid at the presentation of the shipping documents.
OTHERS:
Testing & training:
The plant layout design, assembling and installation, start-up and local team training will be FREE at no cost. But the buyer should be responsible for the round-air tickets, local transportation, board & lodging ,and US$50.-/day/person for the pocket money to our technicians. The testing people will be two persons, and will cost 30 days.
WARRANTY:
The buyer guarantees the quality of the products for 12 months since the date of installation. During the warranty period, any problems/defaults happen on the hard parts of the machinery, the buyer will replace the parts or send the technicians to go to the buyer’s site for repairing and maintenance at the seller’s cost(FREE). If the defaults are aroused by the defaulted operations, or the buyer needs the technical assistance for the processing problems, the buyer should be responsible for all the cost and their allowance.
Utilities:
The buyer should prepare sufficient electric power, water, steam and compressed air supplies which are suitable to be connected to our machinery before the arrival of our machinery.
Packaging Detail:stand seaworthy packing |
Delivery Detail:Within 35 days upon the receipt of the down payment |