JINZHEN 6th generation tyre recycling equipment
tyre recycling equipment, 1.natural gas, wood,coal pyrolysis, 2.Continuous production, 3.Save fuel for 30%, 4.safty - details see: https://www.machineto.com/jinzhen-6th-generation-tyre-recycling-equipment-10340854
Condition:New | Type:Tire Machine | Tire Machine Type:Tire Recycling Machine | Place of Origin:Henan China (Mainland) |
Brand Name:JINZHEN | Model Number:JZS-2989 | Voltage:220V/380V/440V | Power(W):14KW |
Dimension(L*W*H):6.6M*2.6M*2.6M | Weight:35tons | Certification:CE,ISO,BV | Warranty:1 year |
After-sales Service Provided:Engineers available to service machinery overseas | Color:Silver white | Capacity:5-10 tons | Material:245R Boiler Steel |
Model of Cooling:Water cooling | The thickness of the Machine:14mm or 16mm | Operating Pressure:Ordinary Pressure | Equipment Type:Universal Equipment |
Structure Form:Horizontal |
JINZHEN 6th generation tire pyrolysis machine
1.the flow chat of thiswaste tires oil extraction machine:
2.Technical parameters of this waste tires oil extraction machine :
No. | Project (6.0m*2.2m) | |
1 | Equipment model | JZD-12 |
2 | Equipment Price | negotiable |
3 | Material | Plastic/rubber(tires)/life garbage |
4 | structure | Horizontal type revolves |
5 | Capacity (tires) | About 6 tons |
6 | Work pressure | Normal pressure |
7 | Reactor rotational speed | 0.4 R/M |
9 | Coolant conditions | Water |
10 | Cooling water consumption quantity (T/h) | Cycle |
11 | Heating method | Electric induction heating system |
12 | Type of installation | With foundation |
13 | Noise dB(A) | ≤85 |
14 | Reactor (long * diameter) | 6,000mm*2,200mm |
15 | Operating Mode | Intermittent operation |
16 | Installation Power | 260kw |
17 | Power consumption for one batch | About 800kw |
18 | Heating time | About 8 hours |
19 | Total weight | About 30 tons |
3. The International Qualification of our company as follows:
4.Welcome to visit our factory
Packaging Detail:5t or 8t is packed with container10t is packed with container and frame |
Delivery Detail:15 days after paying the advance |