Industrial Water Chiller 40STD-660WD3 Screw Type Water Chiller ( With heat recovery function)
Condition:New | Type:Water-Cooled | Place of Origin:Guangdong China (Mainland) | Brand Name:Hstars |
Model Number:40STD-660WD3 | Cooling Capability(kw):138.7KW | Voltage:380V-3P-50HZ | Dimension(L*W*H):3700*1500*1740mm |
Weight:3330KGS | Certification:CE | Warranty:1 years | After-sales Service Provided:Engineers available to service machinery overseas |
Product Type:Water Chiller | Capacity Type:Heavy Duty |
Products Parameter for Screw Type Water Chiller( With heating water recovery function) :
1.Efficient Cooling Technology
High efficiency heat exchanger(Produce by ourself)
famous brand scroll compressors.(Danfoss)
Saving-energy consumption.Cop:4.0
Low noise levels..
2.Easy In-line Installation
Need not for specialised technicians.
plastic water intake/output couplings.
Prefessional egineer team work
3.Digital Thermostat
Easy to installation
temperature range5°C~20°C.
-10 yrs proven touch screen control boards
-BMS compatible with RS485;
-Dual cooling media outlet temperatures;
-C-channel base , SS panels option;
-Option for power supply, refrigerant;
-Non standard construction available;
-Explosive proof, mobile type;
-Built-in option items;
H'Stars is strong in special chiller for industrial application such as:
1) chemical factory cooling (low temperature chiller),
2) machinery cooling (industrial chiller with chilled water outlet at 12 C and or say 20 C supply cooling to plastic injectiobn machines), or specail production cooling process;
3) beverage cooling process for large temperature difference cooling for juice or milk cooling after pasteurization or sterilization;
4) specail configuration chiller such as explosive proof chiller, integrated chiller (water tank and water pumps all built in a common chassis;
5) Tailor made chiller according enduser's specification;
6) Energy saving of heat recovery and Hot water unit (for sunna and hotel application);
Above a brief of our chiller strong selling points.
Modular chiller:
Hstars Products Serise:
1. In the premise of meet safety and production requirements, reduce the condensing temperature, to maximize evaporation temperature and reduce condensation temperature. Increase the transformation of the cooling tower, in order to ensure the effectiveness of the cooling water.
2. Adjust chiller equipment reasonable running load in the case of ensuring the safe operation of equipment, when the chiller has smaller power consumption unit cooling capacity when run in the 70% -80% load than running at 100% load. Use this way, you should consider the operation of the pumps and cooling tower running.
3. Preventing and reducing pipe scale to add water in order to improve the heat exchange efficiency of the condenser and the evaporator, if the water treatment is not handled well, the calcium carbonate and magnesium carbonate generated by calcium bicarbonate and magnesium bicarbonate heating will be deposited on the pipe. The thermal performance will decline, affecting the heat exchange efficiency of the water cooled condensing unit and the evaporator, and equipment running electricity will substantially increases. In addition to the water treatment technology, you can also take advantage of the pipeline regular automatic cleaning equipment for pipe cleaning.
4. Using refrigerator inverter device to adjust the centrifugal chiller compressor speed. After the low-pressure refrigerant goes through the centrifuge, the pressure is raised. The greater the speed of the centrifuge, the higher the pressure rises. In actual operation, the device is mostly run at non-full load. Fixed speed centrifuge equipment, results in waste of energy running at small load. Frequency centrifugal chillers can automatically adjust the compressor speed based on the load changes, which is more energy-saving.
CE Certificate:
Remarks:
1. Packing: Standard wooden pallet
2. FOB HuangPu(Guangzhou) 42-45 working days after deposit is confirmed
3. Delivery term: (Exclude the shipping cost)
4. Payment term:TT(30% as deposit,balance before shipment)
5. Warranty: Our standard warranty for defect parts covers from the date of original installation or 16 months from the date of shipment from the factory, whichever comes first.
6. Validity: 30 days
7. Payment currency: USD
All products must be test before delivery to our customers
How to take order
A. what are the dimensions and weight of the unit ?
Packaging Detail:Standard wooden package |
Delivery Detail:25-40 days |