hydraulic static pile driver DBYZY800ZB
Condition:New | Place of Origin:Hunan China (Mainland) | Brand Name:DEBOOM | Model Number:YZY800 |
Weight:800T | Dimension(L*W*H):13.80*8.30*3.09m | Certification:GB/T9002-2000ITD ISO9001:2000 | color:Blue,Yellow |
THE CHARACTERISTICS OF YZY SERIES PILE DRIVER:
The hydraulic static pile driver is pile foundation construction equipment with prosperous future. Compared it with others, such as impact, vibration and infusion, it have the features as follows.
1.Civilization, neatness, light labor, low noise, no vibration and no pollution.
2.High efficiency and high piling rate with pressing pile 300-800meter within 8 hours. It has been a powerful machine to finish a large-scale foundation project with large area and short-time.
3.Excellent piling quality, 100% pile-forming rate.
4.Its expense costs is very low in various construction methods according to the calculation for carrying capacity of precast pile per cubic meter. (The costs is nearly as much as driven cast-in-place pile when the carrying capacity is the same as precast pile.)
5.The lower stress of pile has less damage so that it can reduce the manufacturing cost of precast pile.
6.It has the advantages of high mechanization degree,comfortable operation ,flexible and convenient file foundation, fast dismounting and fry ferry.
with the side-pile structure
THE SPECIFICATION OF YZY800:
Model | Unit | YZY800 | |
Parameter | |||
Rated Piling Pressure | (KN) | 8000 | |
Piling Speed | Fast | ( m/ min) | 6.2 |
Low | 0.7 | ||
Pilling stroke per time | (m ) | 1.8 | |
Shift | Longitudinal | (m ) | 3.6 |
Horizontal | 0.7 | ||
Angle range | ( ° ) | 11 | |
Rise stroke | (m ) | 1.1 | |
Max spun pile | (mm ) | 600 | |
Side piling space | (mm) | 800 | |
Comer piling space | (mm) | 1700 | |
Lift weight | (T) | 16 | |
Lift moment | (tf.m) | 80 | |
Power | piling | (kw) | 127 |
Lift | 30 | ||
Dimension | Working Length | (mm) | 14000 |
Working Width | 8300 | ||
Transportation Height | 3100 | ||
Gross weight | (T) | 806 |
at the worksit of VIETNAM
Packaging Detail:Standard export package. |
Delivery Detail:within 30 working days after receipt the 30% deposit. |