hydraulic piling machine for construction/foundation equipment

Features:, no noise, No pullution, High pilling efficiency - details see: https://www.machineto.com/hydraulic-piling-machine-for-construction-foundation-equipment-10113023
Condition:NewPiling Speed(m/min):8.6,7Place of Origin:Hunan China (Mainland)Brand Name:T-works
Model Number:ZYC700Weight:700 TonDimension(L*W*H):13*7.2*3.05After-sales Service Provided:Engineers available to service machinery overseas
Color:yellowsquare pile(mm):600cirle pile(mm):800side piling space(mm):1250
cirle piling space(mm):2500length of work(m):14width of work(m):8.16height(m):3.15
hydraulic piling machine for construction/foundation equipment
contact supplier for hydraulic piling machine for construction/foundation equipment



ZYC700 BD-B

Hydraulic press-in/what is the advantage of the hydraulic pile driver?

Specialty equipment which installs piles using hydraulic cylinders to press piles into the ground. This system is preferred where noise, vibrations and limited access are a concern during the engineering, design and construction phases of the project.This system allows for greater press-in and extraction force to be used since more reaction force is developed. The reaction based machines operate at only 69dB at 23 ft allowing for installation and extraction of piles in very close proximity to noise and vibration sensitive areas where traditional methods may threaten the stability of existing structures.

T-works offer worry-free after sales service

<

paramete / typeZYC700
rated piling pressure(KN)7000
piling speed(m/min)fast7
low1.02
piling stroke(m)1.9
pace(m)longitudinal3.6
horizontal0.7
angle range(°)11
rise stroke (m)1.2
square pile(mm)max550/600
cirle pile(mm)maxΦ600 /Φ800
side piling space(mm)1250
cirle piling space(mm)2500
lifting weight(t)16
lifting pile's lengh(m)15
power(KW)piling111
lifting30
main dimension(m)length of work14
width of work8.16
transprorting height3.15
total weight(T)≥700

vanessalu at twgcjx dot com

0086 188 7425 1614

hydraulic piling machine for construction/foundation equipment
Packaging Detail:main machine nude packed but key parts packed by plastic paper & tape and sealed with grease.
Delivery Detail:20-25 days after the recipt of the deposit

Related Product for hydraulic piling machine for construction/foundation equipment