Hot forging press/brass forging press
Condition:New | Place of Origin:Jiangsu China (Mainland) | Brand Name:tongyong | Model Number:ZW-TA |
Per day:28000-38000 | Products:semi-finished products | Pass rate:98% | The useful life of:10years |
The drive:motor | Stamping the number of time:one | Mold:The whole mold | Feeding method::Auto |
A material way::Auto | Brand::tongyong |
Place of Origin: Jiangsu China (Mainland)
Brand Name: tongyong
Model Number: ZW-TA TYPE
Heating methods: gas heating or intermediate frequency furnace heating
Voltage:380V
Power :115KW-150KW
Heated in two ways, a combustible gas heating, a medium frequency induction furnace heated to invite your company depending on their company production environment
Note: This specification is for reference only, depending on the product.
Quality Assurance:
We guarantee the quality of the product is responsible for the implementation of three bags of policy: If within one year of product quality problems, including repair, replace or return (from the date of delivery).
Product advantages:
1)the high degree of automation: one man operation, full automation, reducing manual
2)Material utilization is high: the whole copper rod (ø15-ø30) into blanks out
3)Safety: a good working environment, fully automated production, safe, reliable, non-work-related injuries
4) a high pass rate: 98% (but the rate of qualified products of the traditional stamping machine is only 90%)
5)high production efficiency: the efficiency is five times the normal vertical machine, the fastest productivity is 100 / min
6)low cost of production: heat, gas and motor, intermediate frequency furnace heating the intermediate frequency electric furnace (60-100KW) and motors consume 30 percent less electricity than traditional stamping machine
Equipment to save:to save labor costs within a year = the price of the machine
To save electricity or gas consumption = 50,000 yuan within a year
Currently, we have developed a water cooling, no fumes, energy-saving and environment-friendly equipment, welcome to the procurement
Machine picture&Product sample pictures
Packaging Detail:wooden case |
Delivery Detail:30 days following receipt of 30% down payment. |