High Quality Cooling Tower Fill

1.Thickness:0.25-0.65mm, 2. L1000-1200*Wi50-500mm, 3.New Material PVC, 4.Fills - details see: https://www.machineto.com/high-quality-cooling-tower-fill-10240530
Material:PVCPlace of Origin:Hebei China (Mainland)Brand Name:YUANHAIModel Number:YH-CGFG001
Length:6mThickness:0.65Usage:Liquid FilterFilter Rating:99.8%
Width:0.5mType:Filter CylinderHole Shape:as photo 
High Quality Cooling Tower Fill
contact supplier for High Quality Cooling Tower Fill


Cooling Tower Fill is one of the most important components for exchange of gas and water in cooling Tower.It is the major parts to improve the efficiency of cooling tower and make sure the economy and safe operation. With the development of the plastic industry, counter-current tower drench water plastic packing "S" shape ladder wave, obliquely wave, which has the heat dissipation ,good performance ,Ventilated small resistance, durable, based on the easy and other advantages, it is widely used in different types of large, medium, small, cooling tower.

Corrugated fills (Cooling Tower packing) Media and type:

Length(mm)

Height(mm)

Film thickness(mm)

SizeToleranceSizeToleranceSizeTolerance

“S” Wave

1000±10500 250±50.4±0.05
2000±10500 250±50.4±0.05
Double Inclined1000±10500 250±50.4±0.05
Inclined Wave1000±10500±50.4±0.05

Corrugated Cooling Tower fills(PVC material)
Heating Power and Resistance Character:

Fill HeightCooling No. (Volume Scattered Coefficient: Ka)Resistance Equotion:P/p1=9.81*A*VcpmA.Mexpression

“S” Wave

1m

=1.83y0.65A=-0.0019q2+0.0685q+0.06543
Ka=4746g0.56q0.36M=-0.0028q2-0.0170q+1.9480

Double Inclined

1m

=1.92y0.68A=-0.0006q2+0.0306q+0.06376
Ka=4342g0.69q0.36M=-0.0002q2-0.0026q+1.9029

Inclined Wave

1m

=1.85y0.64A=-0.0001q2+0.189q+0.6374
Ka=4296g0.63q0.38M=-0.0006q2-0.0122q+2.0178

If you are interested in our products, please contact me in following card.

Your inquiries and questions will be very important for our progress

High Quality Cooling Tower Fill
Packaging Detail:wooden cases
Delivery Detail:Within 15 days for a 20'container

Related Product for High Quality Cooling Tower Fill