high quality cnc machined bicycle parts made in China
Precision CNC machining services, Material :Steel,Zinc,Aluminum,Brass, We fabricate metal parts over 10.000.00pcs/year - details see: https://www.machineto.com/high-quality-cnc-machined-bicycle-parts-made-in-china-10160120
Place of Origin:Guangdong China (Mainland) | Brand Name:Dongguan hongmao | Model Number:HM-03241 | Type:Machining Parts |
Material:Brass | Certification:Rohs | CNC Machining or Not::CNC machining | Material Capabilities:Aluminum, Brass, Bronze, Copper,hardened metals.steel alloys |
finishing:Nickel plating.zinc plating and chrome plating.oxidation | color:a variety of colours | Weight:0.05-1kg | Inspection:100% inspect |
Application:widely | certificate:ISO9001-2008.OEM oder | Dimension:different size | Tolerance:+/-0.05MM |
cnc machined bicycle parts
Material | Steel.zinc.aluminum .brass |
Surface treatment | Nickel plating.zinc plating and chrome plating.oxidation |
Tolerance | +/-0.02mm |
Thread | NPT,BSP.M.GHT>Un.NPSM.BSPT.CHT.NPTF |
Main processes | Machining.drilling.threading.knurling.turning. Drilling.stamping.Castiong |
Inspection | We guarantee every single product at least 5 times of inspection proccesses. |
QC control | 100% inspection on critical dimensionsbefore be shiped |
Inspection equipments | Three-dimensional measuring machine for X,Y,Z with 0.01mm,projection meter |
Inspection Equipments
1 | Hundreds of callipers. |
2 | Micrometers |
3 | Height gages.Depth gages |
4 | Thread gages ,ring threads gages with many types NPT.NPTF ,BSPP.BSPT.NH.M...... |
5 | Projection meter |
6 | Three-dimensional measuring machine(new) |
7 | Plating layer thickness gauge |
8 | Hundreds of go no-go pins |
Major Advantage
1 | 100 SET OF CNC machines for high output with quick delivery |
2 | Skilled and rich experienced staff.We manufacture over parts over 20.000.000pieces per year. |
3 | Always Stable quality control.we can guarantee any single parts must at least 5 inspection process before delivery. |
4 | Most Economic production process for cost saving. |
5 | Material recycle scheme for cost reduction. |
Packaging Detail:Cartons for outer packing and iron pallet for container or according to client's instruct |
Delivery Detail:7-25 days later |